My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-103 - Approving the Water Supply Assessment
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2020
>
2020-103 - Approving the Water Supply Assessment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2020 9:29:27 AM
Creation date
12/18/2020 9:28:39 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Agency
Clerk of the Council
Doc #
2020-103
Date
12/15/2020
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4T" AND CABRILLO <br />WATER SUPPLY ASSESSMENT <br />2. INTRODUCTION <br />2.1 PROJECT DESCRIPTION <br />AUGUST 21, 2020 <br />The 4" and Cabrillo Project is an approximately 8.4-acre residential and commercial project <br />located in the City of Santa Ana. The Project address is bounded by Fourth Street and Cabrillo <br />Park Drive to the south and east, Parkcourt Place to the north, and the Santa Ana Freeway to <br />the west. See Figure 1 for a vicinity map of the proposed Project. The proposed Project site is <br />currently vacant. <br />The Project includes the development a wrap style apartment complex consisting of 644 dwelling <br />units. In addition, 15,200 sf of retail space will be included as part of the complex. <br />The majority of the parking forthe Project will be located within two multi -level parking garages. <br />Amenities of the Project include pool, spa, fitness center, courtyards, dog park and other <br />outdoor trails. Approximately 64,482 SF of landscaped open space is provided through <br />common areas and courtyards. See Table 1 below for additional specifications related to the <br />proposed Project. <br />Table 1 Project Home Type Details <br />Home Type <br />Unit Count <br />Percentage of Total Unit <br />Count <br />Studios <br />39 <br />6.1% <br />One -bedrooms <br />326 <br />50.6% <br />Two -bedrooms <br />248 <br />38.5% <br />Three -bedrooms <br />31 <br />4.8% <br />Total <br />644 <br />100% <br />As mentioned, the purpose of this WSA is to provide information to confirm that the City of <br />Santa Ana has sufficient water supply to provide for the proposed Project in addition to other <br />service area demands now and into the future. This WSA compares the existing water demand <br />of the Project site to the proposed water demand of the Project and to the City of Santa Ana <br />regional water supplies and demands through 2040. <br />FUSCOE ENGINEERING, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.