Laserfiche WebLink
4T" AND CABRILLO <br />WATER SUPPLY ASSESSMENT <br />2.1.1 Existing Water Use <br />AUGUST 21, 2020 <br />As mentioned, the existing land use of the Project site is vacant. The vacant land area is not <br />irrigated and is mainly barren soil and weeds. Therefore, there is currently no existing water <br />demand at the Project. site. See Figure 2 for an aerial image of the existing land uses at the <br />proposed Project site. <br />An estimated annual difference between existing water demands and proposed water demands <br />resulting from the proposed Project are calculated and shown in Section 2.1.2 below. <br />FUSCOE ENGINEERING, INC. 8 <br />