My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-103 - Approving the Water Supply Assessment
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2020
>
2020-103 - Approving the Water Supply Assessment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2020 9:29:27 AM
Creation date
12/18/2020 9:28:39 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Agency
Clerk of the Council
Doc #
2020-103
Date
12/15/2020
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
41H AND CABRILLO <br />WATER SUPPLY ASSESSMENT <br />AUGUST 21, 2020 <br />As shown in Table B above, in all climate scenarios analyzed in the 2015 UWMP, available <br />water supplies are projected to meet demands. Reliability of local water supplies will be ensured <br />through continued implementation of the OCWD Groundwater Management Plan, OCWD's <br />LTFP, and the combined efforts and programs among member agencies of Metropolitan. <br />The City closely monitors development throughout the City to ensure water supplies will meet <br />growing demand. The City has a log of all developments that have required a WSA and track <br />the increases in water demands from these projects. These projects are listed below: <br />• Civic Center Facilities Project WSA (November 2016) <br />• Elan Apartments Project WSA (November 2017) <br />• MainPlace Mall Project WSA (April 2019) <br />• The Bowery Project WSA (August 2020) <br />The 41h and Cabrillo Project has been added to the City's list of proposed developments. The <br />Project is anticipated to be constructed and operational in 2022. As shown in Table 9 below, <br />the City is able to provide water supply to satisfy these additional projects including the 4`h and <br />Cabrillo. <br />FUSCOE ENGINEERING, INC. 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.