My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-103 - Approving the Water Supply Assessment
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2020
>
2020-103 - Approving the Water Supply Assessment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2020 9:29:27 AM
Creation date
12/18/2020 9:28:39 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Agency
Clerk of the Council
Doc #
2020-103
Date
12/15/2020
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
41" AND CABRILLO <br />WATER SUPPLY ASSESSMENT <br />LIST OF TABLES <br />AUGUST 21, 2020 <br />Table 1 Project Home Type Details...................................................................................6 <br />Table 2 Proposed Water Demands.................................................................................10 <br />Table 3 City of Santa Ana Connections to Metropolitan Facilities.......................................12 <br />Table 4 2015 Projected and Actual Water Supply and Demand (Acre-feet).........................13 <br />Table 5 City of Santa Ana Groundwater Production Data 201 7-18...................................15 <br />Table 6 City of Santa Ana Projected Total Water Demands...............................................19 <br />Table 7 Metropolitan Multiple Climate Scenario Water Supply Capability and Projected <br />Demands Comparison from 2020-2040 (AF)..................................................................21 <br />Table 8 City of Santa Ana Multiple Climate Scenario Water Supply and Demand Comparison <br />from 2020-2040(AF)....................................................................................................23 <br />Table 9 City of Santa Ana Ability to Supply the 4" and Cabrillo Project..............................25 <br />LIST OF APPENDICES <br />Appendix A — Proposed Project Water Demand Calculations <br />Appendix B — City of Santa Ana Landscape Guidelines <br />Appendix C — SGMA Basin 8-1 Alternative Plan <br />FUSCOE ENGINEERING, INC. ii <br />
The URL can be used to link to this page
Your browser does not support the video tag.