Laserfiche WebLink
Item No. 2 - Asphalt Concrete (AC) Pavement <br />Payment for Asphalt Concrete (AC) Pavement shall be at the contract unit price bid per Ton as listed in <br />the Fee Proposal, and shall include full compensation for doing all work, including furnishing all materials, <br />labor, equipment, tools, and incidentals as required and no additional compensation will be allowed <br />therefore. <br />Payment for asphalt concrete pavement used in areas of over -excavation to mitigate unsuitable subgrade <br />materials shall be paid for at the contract unit price bid per ton. <br />Item No. 3 — Remove and Replace 18" Corrugated Metal Pipe (CMP) <br />The work under this item consists of grading, compacting subgrade, and constructing Remove and Replace <br />18" Corrugated Metal Pipe (CMP) and shall be in accordance with the provisions of Section 306, <br />"Underground Conduit Construction" and any City Standard Specifications, plans, and/or any City's Special <br />Provisions/Contract Documents provided by the City for each Task Order. <br />Payment for Remove and Replace 18" Corrugated Metal Pipe (CMP) shall be at the contract unit price <br />paid per Linear Foot as listed in the Fee Proposal, and shall include full compensation for doing all work, <br />including removal or replacement of existing pipe, furnishing all materials, labor, equipment, tools, and <br />incidentals as required to install new pipe, bedding preparation, and no additional compensation will be <br />allowed therefore. <br />Item No. 4 — Remove and Replace 18" Reinforced Concrete Pipe <br />The work under this item consists of grading, compacting subgrade, and constructing Remove and Replace <br />18" Reinforced Concrete Pipe and shall be in accordance with the provisions of Section 306, "Underground <br />Conduit Construction" and any City Standard Specifications, plans, and/or any City's Special <br />Provisions/Contract Documents provided by the City for each Task Order. <br />Payment for Remove and Replace 18" Reinforced Concrete Pipe shall be at the contract unit price paid <br />per Linear Foot as listed in the Fee Proposal, and shall include full compensation for doing all work, <br />including removal or replacement of existing pipe, furnishing all materials, labor, equipment, tools, and <br />incidentals as required to install new pipe, bedding preparation, and no additional compensation will be <br />allowed therefore. <br />Item No. 5 — Remove and Replace 30" Reinforced Concrete Pipe <br />The work under this item consists of grading, compacting subgrade, and constructing Remove and Replace <br />30" Reinforced Concrete Pipe and shall be in accordance with the provisions of Section 306, "Underground <br />Conduit Construction" and any City Standard Specifications, plans, and/or any City's Special <br />Provisions/Contract Documents provided by the City for each Task Order. <br />Payment for Remove and Replace 30" Reinforced Concrete Pipe shall be at the contract unit price paid <br />per Linear Foot as listed in the Fee Proposal, and shall include full compensation for doing all work, <br />including removal or replacement of existing pipe, furnishing all materials, labor, equipment, tools, and <br />incidentals as required to install new pipe, bedding preparation, and no additional compensation will be <br />allowed therefore. <br />City of Santa Ana RFP 20-106 <br />Page Al-11 <br />