Item No. 7 — Traffic Control
<br />The work under this item for Signing and Striping shall be in accordance with the latest Watch Manual,
<br />CA MUTCD, Caltrans and any City Standard Specifications, plans, and/or any City's Special
<br />Provisions/Contract Documents to be provided for each Task Order Work.
<br />Payment for Traffic Control shall be at the contract unit price per Lump Sum (LS) as listed in the Fee
<br />Proposal, and shall include full compensation for doing all work, including furnishing all materials, labor,
<br />equipment, tools, and incidentals as required and no additional compensation will be allowed therefore.
<br />Sample Task Order B Items of Work
<br />Item No. 1- Unclassified Excavation
<br />Payment for Unclassified Excavation shall be at the contract unit price per Cubic Yard listed in the Fee
<br />Proposal, and shall include full compensation for doing all work, including furnishing all materials, labor,
<br />equipment, tools, and incidentals as required and no additional compensation will be allowed therefore.
<br />Payment for unclassified fill, if any, is considered as included in the unit price paid for unclassified
<br />excavation.
<br />Payment for over -excavation shall be paid for at the unit price for unclassified excavation.
<br />Item No. 2 - PCC Sidewalk (T=4")
<br />The work under this item consists of grading, compacting subgrade, and constructing 4-inch thick PCC
<br />Sidewalk shall be in accordance with the provisions of Section 301-1, "Subgrade Preparation," and Section
<br />303-5, "Concrete Curbs, Walks, Gutters, Cross Gutters, Alley Intersections, Access Ramps, and Driveways,"
<br />of the Standard Specifications, plans, and contract document specifications.
<br />Payment for PCC Sidewalk (T=4") shall be at the contract unit price bid per Square Foot as listed in the
<br />Fee Proposal, and shall include full compensation for doing all work, including furnishing all materials,
<br />labor, equipment, tools, and incidentals as required and no additional compensation will be allowed
<br />therefore. Payment for thickness (T=6") shall be paid 1.5 times the unit price.
<br />Item No. 3 - PCC Curb Ramp
<br />The work under this item consists of grading, compacting subgrade, and constructing PCC Curb & Gutter
<br />and shall be in accordance with the provisions of Section 301-1, "Subgrade Preparation," and Section 303-5,
<br />"Concrete Curbs, Walks, Gutters, Cross Gutters, Alley Intersections, Access Ramps, and Driveways" and
<br />any City Standard Specifications, plans, and/or any City's Special Provisions/Contract Documents provided
<br />by the City for each Task Order.
<br />Payment for PCC Curb Ramp shall be at the contract unit price bid per Linear Foot as listed in the Fee
<br />City of Santa Ana RFP 20-106
<br />Page Al-7
<br />
|