My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BIG BEN ENGINEERING
Clerk
>
Contracts / Agreements
>
B
>
BIG BEN ENGINEERING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2021 1:35:52 PM
Creation date
12/23/2020 3:33:04 PM
Metadata
Fields
Template:
Contracts
Company Name
BIG BEN ENGINEERING
Contract #
A-2020-245-03
Agency
Public Works
Council Approval Date
12/1/2020
Expiration Date
11/30/2023
Insurance Exp Date
4/5/2022
Destruction Year
2028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Documents provided by the City for each Task Order. <br />Payment for Remove and Replace Chain Link R/W Fence shall be at the contract unit price bid per <br />Square Foot as listed in the Fee Proposal, and shall include full compensation for doing all work, including <br />removal or replacement of existing chain link fence (and posts/foundations), furnishing all materials, <br />labor, equipment, tools, and incidentals as required and no additional compensation will be allowed <br />therefore. <br />Item No. 12 —Concrete Barrier Type 836 (Caltrans) <br />The work under this item consists of grading, compacting subgrade, and removing and/or construction <br />Concrete Barrier Type 836 (Caltrans) and shall be in accordance with the provisions of Section 301-1, <br />"Subgrade Preparation," Caltrans Standard Specifications, any City Standard Specifications, plans, and/or <br />any City's Special Provisions/Contract Documents provided by the City for each Task Order. <br />Payment for Concrete Barrier Type 836 (Caltrans) shall be at the contract unit price bid per Lineal Foot <br />as listed in the Fee Proposal, and shall include full compensation for doing all work, including removal or <br />replacement of existing concrete barrier or other appurtenances, famishing all materials, labor, equipment, <br />tools, and incidentals as required and no additional compensation will be allowed therefore. <br />Item No. 13 — Traffic Control <br />The work under this item for Signing and Striping shall be in accordance with the latest Watch Manual, <br />CA MUTCD, Caltrans and any City Standard Specifications, plans, and/or any City's Special <br />Provisions/Contract Documents to be provided for each Task Order Work. <br />Payment for Traffic Control shall be at the contract unit price per Lump Sum (LS) as listed in the Fee <br />Proposal, and shall include full compensation for doing all work, including furnishing all materials, labor, <br />equipment, tools, and incidentals as required and no additional compensation will be allowed therefore. <br />Sample Task Order C Items of Work <br />Item No. 1- Unclassified Excavation <br />Payment for Unclassified Excavation shall be at the contract unit price per Cubic Yard listed in the Fee <br />Proposal, and shall include full compensation for doing all work, including furnishing all materials, labor, <br />equipment, tools, and incidentals as required and no additional compensation will be allowed therefore. <br />Payment for unclassified fill, if any, is considered as included in the unit price paid for unclassified <br />excavation. <br />Payment for over -excavation shall be paid for at the unit price for unclassified excavation. <br />City of Santa Ana RFP 20-106 <br />Page Al-10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.