Laserfiche WebLink
Item No. 6- Catch Basin (Type "B," W=10') <br />The work under this item consists of grading, compacting subgrade, and constructing Catch Basin and shall <br />be in accordance with theprovisions of Section 301-1, "Subgrade Preparation," and Section 303-1, "Concrete <br />Structures" and any City Standard Specifications, plans, and/or any City's Special Provisions/Contract <br />Documents provided by the City for each Task Order. <br />Payment for Catch Basin (Type "B," W=10') shall be at the contract unit price paid per Each as listed in <br />the Fee Proposal, and shall include full compensation for doing all work, including removal or replacement <br />of existing catch basins and/or other appurtenances, including furnishing all materials, labor, equipment, <br />tools, and incidentals as required to construct a new catch basin, soil preparation and compaction, and no <br />additional compensation will be allowed therefore. <br />Item No. 7 — Traffic Control <br />The work under this item for Signing and Striping shall be in accordance with the latest Watch Manual, <br />CA MUTCD, Caltrans and any City Standard Specifications, plans, and/or any City's Special <br />Provisions/Contract Documents to be provided for each Task Order Work. <br />Payment for Traffic Control shall be at the contract unit price per Lump Sum (LS) as listed in the Fee <br />Proposal, and shall include full compensation for doing all work, including furnishing all materials, labor, <br />equipment, tools, and incidentals as required and no additional compensation will be allowed therefore. <br />City of Santa Ana RFP 20-106 <br />Page Al-12 <br />