My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BIG BEN ENGINEERING
Clerk
>
Contracts / Agreements
>
B
>
BIG BEN ENGINEERING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2021 1:35:52 PM
Creation date
12/23/2020 3:33:04 PM
Metadata
Fields
Template:
Contracts
Company Name
BIG BEN ENGINEERING
Contract #
A-2020-245-03
Agency
Public Works
Council Approval Date
12/1/2020
Expiration Date
11/30/2023
Insurance Exp Date
4/5/2022
Destruction Year
2028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />Appendix <br />ATTACHMENT 1 <br />SCOPE OF WORK <br />CITY OF SANTA ANA <br />REQUEST FOR PROPOSALS <br />FOR <br />ON -CALL EMERGENCY <br />ASPHALT CONCRETE, CONCRETE AND STORMDRAIN REPAIR SERVICES <br />RFP NO.: 20-106 <br />The City of Santa Ana (City) desires to enter into an agreement with a qualified construction company for <br />the repair of roadway asphalt concrete and concrete, underground, storm drain, and/or other infrastructure <br />within the public right of way (with the exception of water and sanitation systems) that may experience <br />failures within the term of the agreement on an on -call and emergency work for general improvements, <br />on an as needed, Task Order basis. Ancillary related work includes, but is not limited to, occasional <br />replacement traffic pavement markings and sign replacements and related support services and paid for as <br />described in Section I.A. "Nature of Work." <br />The purpose of this request for proposals is to obtain qualified construction firms to augment the City's <br />capacity to perform emergency roadway and storm drain repair water service in the event of system <br />failures. <br />DESCRIPTION OF WORK <br />The scope of work will vary per Task Order within the public right-of-way. It may include, but not be limited <br />to, the procurement and/or removal of materials, excavation, installation, backfill, compaction, grading, <br />sidewalk and paving, curb and gutter, fencing, guardrail, barrier, catch basins, removing and/or replacing pipe <br />and related appurtenances, conduits, wiring, and pavement markings, signs, sign posts and miscellaneous <br />other street furniture, and repairing various items within the public right-of-way, traffic control, mobilization, <br />compliance with this agreement and all other work necessary to complete on -call emergency Task Orders <br />specified per incident. <br />The work completed shall be in compliance with the City's Standard Plans, Caltrans Standard Plans and the <br />"Greenbook" and Caltrans' Standard Specifications and as specified in this agreement. Work shall also be in <br />compliance with the City's Standard Plan No. 1160, "Street Work and Utility Permit General Provisions." <br />City of Santa Ana RFP 20-106 <br />Page Al-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.