Item No. 8 — Remove and Replace 30" Reinforced Concrete Pipe
<br />The work under this item consists of grading, compacting subgrade, and constructing Remove and Replace
<br />30" Reinforced Concrete Pipe and shall be in accordance with the provisions of Section 306, "Underground
<br />Conduit Construction" and any City Standard Specifications, plans, and/or any City's Special
<br />Provisions/Contract Documents provided by the City for each Task Order.
<br />Payment for Remove and Replace 30" Reinforced Concrete Pipe shall be at the contract unit price paid
<br />per Linear Foot as listed in the Fee Proposal, and shall include frill compensation for doing all work,
<br />including removal or replacement of existing pipe, furnishing all materials, labor, equipment, tools, and
<br />incidentals as required to install new pipe, bedding preparation, and no additional compensation will be
<br />allowed therefore.
<br />Item No. 9 — Guard Rail Replacement (Caltrans RSP A77N4)
<br />The work under this item consists of grading, compacting Subgrade, and constructing Guard Rail
<br />Replacement (Caltrans RSP A77N4) and shall be in accordance with the provisions of Section 301-1,
<br />"Subgrade Preparation," with the provisions of Section 204, "Lumber and Treatment with Preservatives,"
<br />Section 304-2.2 "Flexible Metal Guard Rail," any City Standard Specifications, plans, and/or any City's
<br />Special Provisions/Contract Documents provided by the City for each Task Order.
<br />Payment for Guard Rail Replacement (Caltrans RSP A77N4) shall be at the contract unit price paid
<br />per Linear Foot as listed in the Fee Proposal, and shall include full compensation for doing all work,
<br />including removal or replacement of existing guard rail, furnishing all materials, labor, equipment, tools,
<br />and incidentals as required to install new guardrail, foundation preparation, and no additional
<br />compensation will be allowed therefore.
<br />Item No. 10 - Guard Rail Replacement Termination (Caltrans)
<br />The work under this item consists of grading, compacting subgrade, and constructing Guard Rail
<br />Replacement Termination (Caltrans) and shall be in accordance with the provisions of Section 301-1,
<br />"Subgrade Preparation," with the provisions of Section 204, "Lumber and Treatment with Preservatives,"
<br />Section 304-2.2 "Flexible Metal Guard Rail," any City Standard Specifications, plans, and/or any City's
<br />Special Provisions/Contract Documents provided by the City for each Task Order.
<br />Payment for Guard Rail Replacement Termination (Caltrans) shall be at the contract unit price paid
<br />per Each as listed in the Fee Proposal, and shall include full compensation for doing all work, including
<br />removal or replacement of existing guard rail termination, furnishing all materials, labor, equipment, tools,
<br />and incidentals as required to install new guardrail termination, foundation preparation, and no additional
<br />compensation will be allowed therefore.
<br />Item No. 11 — Remove and Replace Chain Link R/W Fence
<br />The work under this item consists of grading, compacting subgrade, and construction of foundations to
<br />support the posts for Remove and Replace Chain Link Fence and shall be in accordance with the provisions
<br />of Section 301-1, "Subgrade Preparation," and Section 303-5, "Concrete Curb, Walks, Gutters, Cross Gutters,
<br />Alley Intersections, Access Ramps, and Driveways" and Section 304-3 "Chain Link Fence" of the Standard
<br />Specifications any City Standard Specifications, plans, and/or any City's Special Provisions/Contract
<br />City of Santa Ana RFP 20-106
<br />Page Al-9
<br />
|