Proposal, and shall include full compensation for doing all work, including furnishing all materials, labor,
<br />equipment, tools, and incidentals as required and no additional compensation will be allowed therefore.
<br />Item No. 4 - PCC Curb & Gutter (A-2-8)
<br />The work under this item consists of grading, compacting subgrade, and constructing PCC Curb & Gutter
<br />and shall be in accordance with the provisions of Section 301-1, "Subgrade Preparation," and Section 303-5,
<br />"Concrete Curbs, Walks, Gutters, Cross Gutters, Alley Intersections, Access Ramps, and Driveways" and
<br />any City Standard Specifications, plans, and/or any City's Special Provisions/Contract Documents provided
<br />by the City for each Task Order.
<br />Payment for PCC Curb & Gutter (A-2-8) shall be at the contract unit price bid per Linear Foot as listed
<br />in the Fee Proposal, and shall include full compensation for doing all work, including furnishing all
<br />materials, labor, equipment, tools, and incidentals as required and no additional compensation will be
<br />allowed therefore.
<br />Item No. 5- Furnish and Install New #6 Pull Box
<br />The work under this item for Furnish and Install New #6 Pull Box shall be in accordance with the latest
<br />CA MUTCD, Caltrans and any City Standard Specifications, plans, and/or any City's Special
<br />Provisions/Contract Documents to be provided for each Task Order Work. The assumed material for
<br />placement shall be concrete and any removal of an existing pull box shall be included in the price paid to
<br />fiunish and install a new pull box and no additional payment will be allowed therefore.
<br />Payment for Furnish and Install New #6 Pull Box shall be at the contract unit price paid per Each as
<br />listed in the Fee Proposal, and shall include full compensation for doing all work, including furnishing all
<br />materials, labor, equipment, tools, and incidentals as required and no additional compensation will be
<br />allowed therefore.
<br />Item No. 6 - Adjust Manhole to Finished Grade
<br />Payment for Adjust Manhole to Finished Grade shall be at the contract unit price bid per Each as listed
<br />in the Fee Proposal, and shall include full compensation for doing all work, including furnishing all
<br />materials, labor, equipment, tools, and incidentals as required and no additional compensation will be
<br />allowed therefore.
<br />Item No. 7- Catch Basin (Type °B," W=10')
<br />The work under this item consists of grading, compacting subgrade, and constructing Catch Basin and shall
<br />be in accordance with the provisions of Section 301-1, "Subgrade Preparation," and Section 303-1, "Concrete
<br />Structures" and any City Standard Specifications, plans, and/or any City's Special Provisions/Contract
<br />Documents provided by the City for each Task Order.
<br />Payment for Catch Basin (Type °B," W=10') shall be at the contract unit price paid per Each as listed in
<br />the Fee Proposal, and shall include full compensation for doing all work, including removal or replacement
<br />of existing catch basins and/or other appurtenances, including furnishing all materials, labor, equipment,
<br />tools, and incidentals as required to construct a new catch basin, soil preparation and compaction, and no
<br />additional compensation will be allowed therefore.
<br />City of Santa Ana RFP 20-106
<br />Page Al-S
<br />
|