Item No. 2 - Asphalt Concrete (AC) Pavement
<br />Payment for Asphalt Concrete (AC) Pavement shall be at the contract unit price bid per Ton as listed in
<br />the Fee Proposal, and shall include full compensation for doing all work, including famishing all materials,
<br />labor, equipment, tools, and incidentals as required and no additional compensation will be allowed
<br />therefore.
<br />Payment for asphalt concrete pavement used in areas of over -excavation to mitigate unsuitable subgrade
<br />materials shall be paid for at the contract unit price bid per ton.
<br />Item No. 3 — Remove and Replace 18" Corrugated Metal Pipe (CMP)
<br />The work under this item consists of grading, compacting subgrade, and constructing Remove and Replace
<br />18" Corrugated Metal Pipe (CMP) and shall be in accordance with the provisions of Section 306,
<br />"Underground Conduit Construction" and any City Standard Specifications, plans, and/or any City's Special
<br />Provisions/Contract Documents provided by the City for each Task Order.
<br />Payment for Remove and Replace 18" Corrugated Metal Pipe (CMP) shall be at the contract unit price
<br />paid per Linear Foot as listed in the Fee Proposal, and shall include full compensation for doing all work,
<br />including removal or replacement of existing pipe, furnishing all materials, labor, equipment, tools, and
<br />incidentals as required to install new pipe, bedding preparation, and no additional compensation will be
<br />allowed therefore.
<br />Item No. 4 — Remove and Replace 18" Reinforced Concrete Pipe
<br />The work under this item consists of grading, compacting subgrade, and constructing Remove and Replace
<br />18" Reinforced Concrete Pipe and shall be in accordance with the provisions of Section 306, "Underground
<br />Conduit Construction" and any City Standard Specifications, plans, and/or any City's Special
<br />Provisions/Contract Documents provided by the City for each Task Order.
<br />Payment for Remove and Replace 18" Reinforced Concrete Pipe shall be at the contract unit price paid
<br />per Linear Foot as listed in the Fee Proposal, and shall include full compensation for doing all work,
<br />including removal or replacement of existing pipe, furnishing all materials, labor, equipment, tools, and
<br />incidentals as required to install new pipe, bedding preparation, and no additional compensation will be
<br />allowed therefore.
<br />Item No. 5 — Remove and Replace 30" Reinforced Concrete Pipe
<br />The work under this item consists of grading, compacting subgrade, and constructing Remove and Replace
<br />30" Reinforced Concrete Pipe and shall be in accordance with the provisions of Section 306, "Underground
<br />Conduit Construction" and any City Standard Specifications, plans, and/or any City's Special
<br />Provisions/Contract Documents provided by the City for each Task Order.
<br />Payment for Remove and Replace 30" Reinforced Concrete Pipe shall be at the contract unit price paid
<br />per Linear Foot as listed in the Fee Proposal, and shall include full compensation for doing all work,
<br />including removal or replacement of existing pipe, furnishing all materials, labor, equipment, tools, and
<br />incidentals as required to install new pipe, bedding preparation, and no additional compensation will be
<br />allowed therefore.
<br />City of Santa Ana RFP 20-106
<br />Page Al-11
<br />
|