JUSTIN ROBERTS
<br />Chief Operating Officer/Project Manager
<br />RESUME
<br />Fourteen years experience in the pipeline construction industry, managing and performing a full spectrum of general and specific
<br />pipeline labor duties.
<br />SKILLS
<br />• Heavy Equipment Operator
<br />• Skilled in the use of pipeline construction equipment and tools
<br />• Effectively applies methodology and enforces project standards
<br />• Strong communication and organizational skills
<br />• Qualified and experienced in supervising work crews up to 10 persons
<br />• Efficiently and effectively complete projects with quality results
<br />• Participant in the Motor Carrier Employer Pull Notice Program
<br />T.E. Roberts, Inc., Orange, CA
<br />Chief Operating Officer/Project Manager/Superintendent
<br />2004-Present
<br />Manage completion of residential and commercial construction projects in a
<br />timely and professional manner. Supervise crews of skilled heavy equipment operators and general labor personnel. Maintain strict
<br />safety standards and procedures.
<br />CERTIFICATIONS
<br />• Confined Space Entry • Asbestos Pipe
<br />• Heat Illness • Accident Investigation
<br />• Slips/Trips and Falls • Hotwork
<br />• Lockout/Tag out • Global Harmonized Systems
<br />• Excavation Safety and Competent Person • First Aid
<br />California Class A Driver's License since 2-18-09
<br />A Sample of Projects Justin Has Completed With T.E. Roberts, Inc.
<br />Owner: City of Newport Beach, 100 Civic Center Drive. Newport Beach, Owner: Irvine Ranch Water District, 15600 Sand Canyon Avenue, Irvine, CA
<br />CA
<br />92619
<br />POC: Alfred Casianon. Associate Civil Engineer 949644-3314,
<br />POC: Toni Lynch 949340-6642 lynch@ihwd.com
<br />acastanonCnexponbeachca.gov
<br />Project Name: Orange County Great Park Reach A Sewer Improvements/5822
<br />Project Name: Water Transmission Main Valve Replacement'5875
<br />Description: 1.435'-18" sewer pipe in 36" casing with jack and bore across 15
<br />Description: Remove and replace Water Main Valve
<br />Freeway and upsize existing 949'-12" sewer pipe to 18" with restoration
<br />Contract Award: S749,933 Current Completion: 65%
<br />Contract Award: S 1,251,110.00 Self Performed: 55%
<br />Project Awarded: 5-30-19 Estimated Completion: 1-31-20
<br />Project Awarded: 9-11-18 Completed: 8-15-19
<br />Owner: City of Newport Beach, 100 Civic Center Drive, Newport Beach, Owner: Orange County Water District 18700 Ward Street, Fountain Valley, CA
<br />CA 92660
<br />92708
<br />POC: Alfred Castanon Associate Civil Engineer 949 644-3314.
<br />POC/Engineer: Benjamin Smith, Engineer 714 378-3211 6smilhCoocwd.com
<br />acasmnonCanewportbeachca.gov
<br />Project Name: Mid Basin Injection, Centennial P",15745
<br />Project Name: Balboa Island Water Main Replacement Phase 215838
<br />Description: 9.500' 12-36" CMUC pipeline construction with appurtenances and
<br />Description: 3, 100' 12" PVC, 100'8" PVC, 850'6" PVC, 30'4" PVC water restoration
<br />line and appurtenances with restoration
<br />ContracLAward: S2,756,010.00 Self Performed: 95%
<br />Contract Award: S2r12.300.00 Completed Amount Sl 951,131.06
<br />Project Awarded: 8-8-17 Completed: 9-5-I8
<br />Project Awarded: I I-27-18 Completed: 5-24-19
<br />Owner: City of Newport Beach, 100 Civic Center Drive, Newport
<br />Owner: South Coast Water District, 31592 West Street, Laguna Beach, CA 92651
<br />Beach, CA 92660
<br />POC: Joe Sinacori (949) 4994555 ext 3178 jsinacori@sewd.ohg
<br />POC: Alfred Castanon Associate Civil Engineer 949 644-3314,
<br />Pt oject Name: PCH Recycled Water Distribution Bottleneck Upsizingi5663
<br />a,astanonCy newportbeachca.gov
<br />Description: Install 6,350'-16" PVC pipeline with appurtenances and restoration
<br />Project Name: Balboa Island Water Main Replacement Phase V5767
<br />Contract Award: S3,201,375.00 Self Performed: 84%
<br />Description: 600' 12- PVC, 50' 10" PVC, 2,000' 8" PVC, 300' 6"
<br />Project Awarded: 7-28-16 Completed: 5-27-17
<br />PVC, 50' 4-PVC water line and appurtenances with mimation
<br />Contract Award: SI,563,400.00 Self Performed: 89%
<br />Project Awarded: 12-1-17 Completed: 4-18-18
<br />
|