Laserfiche WebLink
QUANTITIES FOR FEE SCHEDULE (UNDER SEPARATE COVER) <br />For the purposes of providing a Fee Schedule based on the below Sample Task Orders, the following work <br />items and quantities are provided. The Fee Schedule in Attachment 5: <br />Each Fee Schedule shall include a schedule of the hourly billing rates for ALL contractor and subcontractor <br />staff and labor personnel. Additionally, for each discipline that a company seeks to be considered, the below <br />table(s) shall be completed. For example, if a General Contractor is submitting for Asphalt Concrete and <br />Concrete Work, Sample Task Orders A and B would both be required to be completed as part of the Fee <br />Schedule. Each table shall include the filling in of the last two columns for the relevant sample task orders <br />for whichever category(ies) are being submitted for consideration. However, actual work will be paid for as <br />described in Section I.A. "Nature of Work." Sample Task Orders for Asphalt Concrete and Concrete <br />roadway and sidewalk and Stormdrain public right-of-way related work are, respectively: <br />Sample Task Order A - Asphalt Concrete <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Total <br />I <br />Unclassified Excavation <br />550 <br />Cy <br />220 - <br />17-1 000 ,' <br />2 <br />AC Pavement <br />130 <br />TN <br />34 - <br />44 boo,- <br />3 <br />Fumish and Install #6 Pullbox <br />4 <br />EA <br />1 D , <br />gD , <br />4 <br />Adjust Manhole to Finished Grade <br />5 <br />EA <br />1 L <br />5 - <br />5 <br />PCC Curb and Gutter (Type A-2-8 <br />10o <br />LF <br />6 <br />Signing and Striping <br />1 <br />LS <br />"1 810.� <br />-7D-- <br />7 J <br />Traffic Control Work <br />I <br />LS <br />5 ODD.— <br />0D .- <br />Sample Task Order B - Concrete Paving <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Total <br />I <br />Unclassified Excavation <br />550 <br />Cy <br />22D <br />121 000.' <br />2 <br />PCC Sidewalk =4" <br />2,500 <br />SF <br />15.' <br />3 00 . <br />3 <br />PCC Curb Ramp <br />3,000 <br />SF <br />Z ,' <br />4 <br />PCC Curb and Gutter T A-2-8 <br />100 <br />LF <br />5 <br />- ' <br />5 <br />Furnish and Install 96 Pullbox <br />4 <br />EA <br />1 1-1p' <br />6 <br />Adjust Manhole to Finished Grade <br />5 <br />EA <br />I 250- <br />7 <br />Catch Basin e'13"W=10' <br />1 <br />EA <br />12 ISD. <br />12 t9D.' <br />8 <br />Remove and Replace 30" Reinforced Concrete Pie <br />75 <br />LF <br />' A q 0 - <br />3 s-- <br />9 <br />Guard Rail Replacement Caltrans RSP A77N4 <br />50 <br />LF <br />:" <br />10 p J <br />10 <br />Guard Rail Replacement Termination Caltrans <br />1 <br />EA <br />D.-1 <br />I I <br />Remove and Replace Chain Link R/W Fence <br />50 <br />LF <br />- <br />12 1 <br />Concrete Barrier Type 836 Caltrans <br />50 <br />LF <br />Z$ <br />3 - <br />13 <br />Traffic Control Work <br />_I <br />LS <br />S DOp' <br />S 00 0 - <br />City of Santa Ana RFP 20-106 <br />Page Al-2 <br />