My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TE ROBERTS
Clerk
>
Contracts / Agreements
>
T
>
TE ROBERTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2024 11:20:43 AM
Creation date
12/23/2020 3:37:24 PM
Metadata
Fields
Template:
Contracts
Company Name
TE ROBERTS
Contract #
A-2020-245-01
Agency
Public Works
Council Approval Date
12/1/2020
Expiration Date
11/30/2023
Destruction Year
2028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C <br />QUANTITIES FOR FEE SCHEDULE (UNDER SEPARATE COVER) <br />For the purposes of providing a Fee Schedule based on the below Sample Task Orders, the following work <br />items and quantities are provided. The Fee Schedule in Attachment 5: <br />Each Fee Schedule shall include a schedule of the hourly billing rates for ALL contractor and subcontractor <br />staff and labor personnel. Additionally, for each discipline that a company seeks to be considered, the below <br />table(s) shall be completed. For example, if a General Contractor is submitting for Asphalt Concrete and <br />Concrete Work, Sample Task Orders A and B would both be required to be completed as part of the Fee <br />Schedule. Each table shall include the filling in of the last two columns for the relevant sample task orders <br />for whichever category(ies) are being submitted for consideration. However, actual work will be paid for as <br />described in Section I.A. "Nature of Work." Sample Task Orders for Asphalt Concrete and Concrete <br />roadway and sidewalk and Stormdrain public right-of-way related work are, respectively: <br />Sample Task Order A - Asphalt Concrete <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Total <br />I <br />Unclassified Excavation <br />550 <br />Cy <br />I?-p — <br />121 000 .- <br />2 <br />AC Pavement <br />130 <br />TN <br />34 � <br />44 MO,- <br />3 <br />Furnish and Install #6 Pullbox <br />4 <br />EA <br />I D - <br />"I $D ,' <br />4 <br />Adjust Manhole to Finished Grade <br />5 <br />EA <br />I L ' <br />5 _ <br />5 <br />PCC Curb and Gutter T A-2-8 <br />100 <br />LF <br />6 <br />Signing and Striping <br />I <br />LS <br />7 S-10 ` <br />?D-- <br />7 <br />Traffic Control Work <br />:jT <br />LS <br />5 DDD.— <br />Sample Task Order B - Concrete Paving <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Total <br />I <br />Unclassified Excavation <br />550 <br />CY <br />120 <br />121 000.' <br />2 <br />PCC Sidewalk =4" <br />2,500 <br />SF <br />15' <br />3 00 . , <br />3 <br />PCC Curb Ramp <br />3,000 <br />SF <br />4 <br />PCC Curb and Gutter (Type A-2-8 <br />100 <br />LF <br />5 <br />5 <br />Furnish and Install #6 Pullbox <br />4 <br />EA <br />17 p <br />— <br />6 <br />Adiust Manhole to Finished Grade <br />5 <br />EA <br />2S0' <br />6 25o- <br />7 <br />Catch Basin (Type "B," W=10' <br />1 <br />EA <br />1 z, I S D� <br />12 [so" <br />8 <br />Remove and Replace 30" Reinforced Concrete Pie <br />75 <br />LF <br />'-1010 , <br />3 S70.1 <br />9 <br />Guard Rail Re lacement Caltrans RSP A77N4 <br />50 <br />LF <br />uo;� <br />i n D b - <br />10 <br />Guard Rail Re lacement Termination Caltrans <br />1 <br />EA <br />p.-1 <br />I I <br />Remove and Replace Chain Link R/W Fence <br />50 <br />LF <br />- <br />f. sop <br />12 <br />Concrete Barrier Type 836 Caltrans <br />50 <br />LF <br />2$ .'IL4 <br />3 <br />13 <br />Traffic Control Work <br />1 <br />LS <br />S ODO ' <br />S D o 0 - <br />City of Santa Ana RFP 20-106 <br />Page At-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.