Laserfiche WebLink
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 20-2706 <br />ADAMS PARK IRRIGATION IMPROVEMENTS <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: Mariposa Landscapes, Inc. <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />funlish all material and do all the work required to complete the said work in accordance with <br />said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the <br />following schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />1 <br />Finnish and Install Rain Bird Falcon <br />155 <br />EA <br />$ <br />$ <br />6504 Series Rotor <br />121.26 <br />18.795.00 <br />2 <br />Furnish and Install Rectangular Valve <br />25 <br />EA <br />$ <br />$ <br />Box with Non Potable Cover <br />109.20 <br />2,730.00 <br />3 <br />Furnish and Install 6" Round Valve <br />15 <br />EA <br />$ <br />$ <br />Box with Non Potable Cover <br />105.00 <br />1,575.00 <br />4 <br />Irrigation Modification, Controller <br />I <br />LS <br />$ <br />$ <br />Testing and Programming <br />400.00 <br />400.00 <br />$ 23,500.00 <br />TOTAL BASE BID <br />The lowest responsible bidder shall be selected based on the total base bid. The City reserves the <br />right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any). <br />* The quantity for this bid item is shown for bid comparison only. This bid item shall not be <br />subject to the "25%" limit as stated in Section 3-2 of the Standard Specifications. The actual <br />amount for this item will'be dictated by the actual quantity used, and the Agency reserves the <br />right to increase or decrease the quantity of this item accordingly. <br />t This bid item is considered a Specialty Item per Section 2-3.2 of the Standard Specifications. <br />TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES <br />The undersigned bidder hereby proposes to complete the Work for the total base bid amount <br />shown above, within twenty (20) working dates after the commencement date stated in the Notice <br />to Proceed. <br />The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the <br />Standard Specifications, shall be $500 per calendar day. <br />P-1 ofP-17 <br />