My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ASPLUNDH CONSTRUCTION, LLC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
ASPLUNDH CONSTRUCTION, LLC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2022 11:00:50 AM
Creation date
12/23/2020 4:43:42 PM
Metadata
Fields
Template:
Contracts
Company Name
ASPLUNDH CONSTRUCTION, LLC.
Contract #
P 18-2668
Agency
Public Works
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ORDER <br />Project Number 18-2688: Security Lighting At Morrison Park Change Order Number 1 <br />To Asplundh Construction, LLC, Canlraclor <br />You are hereby diroctad to make the herein changes from the plans and speolflcatlons or do the following described work not Included in the plans and <br />spedflcaflons on this conhact <br />NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNfILAPPROVED BY THE CITY COUNCILOR <br />Unless otherwise stated, rates for rental of equipment cover only such Ume as equipment is actually used and no allowance will be made for idle rime. <br />Change requested by PUBLIC WORKS AGENCY � <br />XTRA WORK 61 31ME AND MATERIALSGREED UNIT PMIrP <br />1. Install 2'x3'x8" concrete extension ring waterproof sealant, and steel lid for existing junction box, <br />(T&M#01) (Asplundh#3944) <br />Final Cost = $1,839.89 <br />2. Install 3" schedule 80 PVC water main and three value boxes. (T&M#02) (Asplundh#3946) <br />Final Cost = $2,1 gg,85 <br />3. Install anew Intermatio time clock for basketball courts lightings. (T&M#03) (Asplundh#3947) <br />Final Cost = $502.66 <br />l JOWIV if] <br />4, Upgrade mechanical time clock to Electronic Time Stitch 2-circuit for park walkway lightings. <br />(PCO#04) <br />Agree Price = $1,444.37 <br />TOTAL FINAL COST. S'; W 77 <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.