Laserfiche WebLink
THE ATCHISON, TOPEKA AND SANTA FE RAILWAY COMPANY - COAST LINES <br />EXHIBIT "B" <br />Summary - Estimate of Cost, Santa Ana Intercity Transportation Center <br />1. <br />Engineering, Inspection and Flagging <br />(Perm) <br />55,391 <br />2. <br />Communications <br />(Perm) <br />28,531 <br />3. <br />Signal <br />(Perm) <br />535,966 <br />4. <br />Track <br />(Perm) <br />625,116 <br />5. <br />Loading <br />Dock <br />(Perm) <br />16,466 <br />6. <br />Paving <br />(Perm) <br />120,000 <br />7. <br />Remove <br />- Garage Building <br />(Perm) <br />3,000 <br />Add for Contingencies <br />130,894 <br />Estimated Cost of Labor and Material <br />1,515,365 <br />Auditing and Billing <br />4,738 <br />Equipment Rental and <br />Depreciation <br />72,415 <br />Transportation of Equipment <br />7,500 <br />Credit for Material Recovered: <br />Signal 3,000 <br />Less Cost to Return to Stock - 120 <br />2,880 <br />- 2,880 <br />Estimated Cost of Work to be <br />Performed by Santa Fe Forces and <br />Paid for by the City of Santa Ana 1,597,137 <br />-2- <br />