Laserfiche WebLink
1.13 <br />Unclassified Excavation <br />850 <br />CY <br />$76,00 <br />$0,,750.00 <br />1.14 <br />Asphalt Concrete(T=8.5) <br />1,200 <br />TN <br />$100.00 <br />$120,000.00 <br />1.15 <br />AsphaltRubberN tMix(ARHM) <br />330 <br />TN <br />$145:00 <br />$47,850.00 <br />1.16 <br />PCC Sidewalk <br />210 <br />SF <br />$21.00 <br />$4,410.00 <br />PCC Driveway Approach (Commercial <br />1680 <br />SF. <br />$32.00.. <br />$63,760.00 <br />1.18 <br />PCC Curb & Gutter (Type A-2-8) <br />316 <br />LF <br />$58.00 <br />$18,270.00 <br />Cross `iiuhor (Arterial Stree'tsj'` ` <br /><i °1260 ' "'': <br />5F ' ```y' <br />$32 00 ;' <br />$4b320.00'.'" <br />1.20 <br />Adjust Manhole Frame and Cover to <br />Tiniscade <br />2 <br />EA <br />$1,750 <br />$3,500.00 <br />' 1.21 <br />Construct ADA Curb Ramp <br />2 <br />EA <br />$9 000.00 $9,000 00 <br />1.22 <br />Signing and Striping <br />1 <br />LS <br />$5,000,00 <br />$5,000.00 <br />1.23 <br />Traffic Control and Traffic Control Plan <br />1.LS <br />:. <br />$8,500.00 <br />: $8,500:00 <br />1.24 <br />As -Built Plans <br />1 <br />LS <br />$3,000.00 <br />$3,000.00 <br />TOTAL AGREED PRICE = $788,240.00 <br />Page 2 of 3 <br />