My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALL CITIES ENGINEERING, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
ALL CITIES ENGINEERING, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2022 10:53:06 AM
Creation date
1/29/2021 8:48:03 AM
Metadata
Fields
Template:
Contracts
Company Name
ALL CITIES ENGINEERING, INC.
Contract #
P 15-6446
Agency
Public Works
Council Approval Date
11/17/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />U <br />i <br />CITY OF SANTA ANA <br />Project Number Project No. 15-6446; Saint Gertrude and Grand Avenue Water <br />Main Replacement <br />To All Cities Encineerina Inc. <br />PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ORDER <br />Change Order Number <br />Contractor <br />You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and <br />specifications on this contract. <br />NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br />Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br />Change requested by PUBLIC WORKS AGENCY <br />EXTRA WORK AT AGREED UNIT PRICE <br />1) Delete bid items 30, 31 and 33 and add the following bid items per (PCO No. 26-Hardy & Harper, Inc). <br />ESTIMATED ESTIMATED <br />ITEM# DESCRIPTION QUANTITY UNIT UNITPRICE AMOUNT <br />30 <br />_ <br />Asphalt Concrete 2,061 TN $97.00 ($199,917.00) <br />31 <br />Asphalt Rubber Hot Mix(ARHM) 1,906 TN $95.00 ($181,070.00) <br />33 <br />Cold Mill =3" 125,210 SF $0.30 $37,563.00 <br />3.1 ASPHALT CONCRETE 1,753 TN $110.00 $192,830.00 <br />3.2 <br />Asphalt Rubber Hot Mix (ARHM) 1,248 TN $120.00 $149,760.00 <br />3.3 <br />Cold Mill (T=21 104,067 SF $0.40 $41 626.80 <br />ESTIMATED TOTAL = (34,333.20) <br />EXTRA WORK AT AGREED COST <br />2) Rescind Change Order 1 (PCO#2). AGREED COST = ($788,240.00) <br />3) To compensate the contractor for costs associated with additional 32 linear feet of boring realignment <br />per revised boring plan dated February 2, 2022(PCO No. 19). <br />AGREED COST = $37,209.28 <br />4) To compensate the contractor for costs associated with casing cost escalation for jack and bore <br />operation (PCO No. 15). <br />AGREED COST = $3,036.96 <br />5) To compensate the contractor for costs associated with United Pacific Rail Road permit fees over the <br />$20,000 permit allowance included in Bid Item No. 44 for the jack and bore operation (PCO No. 25). <br />AGREED COST = $36,526.00 <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.