My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BUTIER ENGINEERING
Clerk
>
Contracts / Agreements
>
B
>
BUTIER ENGINEERING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2021 5:38:47 PM
Creation date
2/4/2021 5:36:55 PM
Metadata
Fields
Template:
Contracts
Company Name
BUTIER ENGINEERING
Contract #
A-2021-005
Agency
Public Works
Council Approval Date
1/19/2021
Expiration Date
1/18/2024
Insurance Exp Date
1/1/1900
Destruction Year
2029
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />City of Santa Ana, Public Works Agency <br />South Main Corridor Improvements Project <br />Construction Management and Inspection Services, RFP No. 20-115 <br />recovery plan. The plan should address <br />mitigation efforts such as additional crews, <br />additional shifts, or developing work -around <br />schedules that move the delayed activity off the <br />critical path so that its completion will not affect <br />critical milestones. <br />The Butler Team will develop a QA/QC Plan for <br />the South Main Corridor Improvements <br />Project. The plan will reflect a set of objectives <br />defined by City staff and assigned CM and field <br />inspection personnel. The QA/QC Plan will be <br />organized accordingly: <br />• Organization and Responsibility <br />• Execution and Schedule <br />• Procedural Requirements <br />• Requirements for Consultants <br />• Project Quality Management Audits <br />These sections define requirements and <br />procedures for checking, reviewing, <br />distributing, tracking, and controlling <br />documents. The project specific QA/QC Plan <br />will be submitted and reviewed by the City <br />prior to submittal of other project deliverables. <br />The individuals performing QA/QC reviews will <br />be clearly indicated in the project organization <br />chart. Deliverables will contain a statement <br />that the information contained in the submittal <br />has been quality control checked in <br />accordance with the QA/QC Plan, <br />Quality Assurance is the confirmation <br />process that all procedures directing the work <br />have been developed and followed and any <br />corrective actions required have been <br />implemented. Procedures or actions to be <br />confirmed include: <br />• Construction management plan <br />• Training of staff in QA/QC requirements <br />• Submittal process plan <br />• Document control plan <br />• Identification of City approvals at <br />appropriate milestones <br />• Control of testing to determine validity and <br />accuracy of data collected in the field <br />• Identification of need for corrective action <br />• Audit to verify compliance with Plan. <br />Quality Control is the actual checking and <br />validation of the inputs and outputs of the <br />work. Activities to be verified for the work <br />include the following: <br />• Review by quality control team <br />• Identification and compliance with <br />applicable codes, ordinances, permits, <br />environmental requirements, etc. <br />• Review input data and check calculations <br />• Review drawings, specifications, technical <br />reports, memos, meeting minutes <br />• Perform constructability, operability, <br />maintainability, and usability reviews <br />• Review design for compliance with safety <br />standards. <br />The Principal -In -Charge and Project Manager <br />will prepare a specific CM Communications <br />Plan to be approved by the City. The manual <br />will include project correspondence and other <br />forms of communication in accordance with <br />the City's document formatting standards. The <br />manual will integrate the interdependent roles <br />of the City, Construction Manager, Design <br />Engineer, and the Contractor, through all <br />phases of the work. <br />The Manual will include the following <br />• Project Organization: Individual <br />assignments, responsibilities, phone <br />numbers, lines of communication, and <br />methods for interfacing with the City, <br />project stakeholders, and the Contractor. <br />Organization chart showing relationships <br />between the parties. <br />• Project Control: Description of cost, <br />schedule, and document control systems. <br />• Communication Management: <br />Procedures for documenting <br />communications and correspondence; <br />distribution and/or routing lists; and <br />examples of all forms that the Contractor <br />C. UNDERSTANDING OF t. <br />
The URL can be used to link to this page
Your browser does not support the video tag.