Laserfiche WebLink
Victory Road Extension <br />Roadway Construction; <br />Tustin, CA <br />City of Tustin, Public Works <br />Ken Nishikawa <br />Deputy Director <br />Tel: (714) 573-3389 <br />Value: $4.6 million <br />Completion: 2017 <br />Proposed Key Personnel <br />Mark Butier <br />Joseph Blum <br />Ryan Weir <br />City of Santa Ana, Public Works Agency <br />South Main Corridor Improvements Project <br />Construction Management and Inspection Services, RFP No, 20-115 <br />Butler provided construction management and <br />field inspection services. The project extended <br />from the existing "Tee" intersection of Red Hill <br />Avenue and Victory Road southeast to 0 <br />Armstrong Avenue. The scope of work <br />consisted of finishing of undercuts of streets <br />and parkway grading; erosion and sediment <br />control; installation of basins, storm drain, and <br />drainage structures; construction of channels and swales; protection in place <br />and/or demolition of IRWD facilities; pavement striping, signing and delineation; <br />traffic sign installation and interconnect; and construction of water, reclaimed <br />water and sanitary sewer facilities. Butier coordinated with the County of Orange, <br />IRWD, Caltrans, USACE, RWQCB, OCSD, South Coast AQMD, and SCE. <br />BUTW 13. RELEVANT PROJECT EXPERIENCE <br />