Laserfiche WebLink
FEB 0 6 20^21 <br />?cN <br />alifornia W� <br />AVEVA Distributor <br />126 Mill Street <br />Healdsburg, CA 95448 QUOTE 242538.6 CTYSA <br />WONDER <br />{866j 6i6NMN -WW Walnut Site Integration Services <br />RANCE NOT OI�ILV � 01/27/2021 Direct Opp <br />WORK MAY NOT PROCEED Revising <br />CLERK OF COUNCIL Attn. CITY OF SANTAANA <br />Ship To: CITYOFSANTAANA DATE: <br />220 S. DAISY AVE <br />SANTAANA, CA 92703 <br />Bill To: CITY OF SANTAANA <br />220 S. DAISY AVE <br />SANTAANA, CA 92703 <br />LFS <br />Thank you for tMe opportunity to offer you this quote! <br />Revision 6 Modifications: <br />- Extended expiration date of proposal to 2/20/2021 <br />direct ( ) - A-2021-002 <br />fax <br />From: Kristen Hall <br />kristen. hallacalifornia.wonderware.com <br />direct (707) 473-3105 <br />main (866) 966-3376 <br />fax (707)473-3190 <br />This is a Time and Material (T&M) proposal for Wonderware California, an AVEVA Distributor, to provide an Aveva System <br />Platform -based and OMI Migration for the City of Santa Ana. This proposal is in response to our meeting with the City on May <br />13, 2020. <br />Scope of work for this project would consist of the creation of new System Platform -based SCADA system. It would utilize <br />standardized System Platform objects and OMI-based graphics for a single pump station. These would be developed, <br />deployed, and tested and would act as the starting point for the replacement of the existing DYNAC-ES SCADA System. The <br />following figure illustrates the new system architecture. Note that this assumes the existence of a domain controller along with <br />the existing Historian and Dream Report server. <br />Scope of work would include: <br />- Design & deployment of new System Platform -based architecture (the City already has a Historian and Dream Report <br />deployed) <br />- Design & development of new standard System Platform templates <br />- Design & development of new OMI-based graphics <br />- Deployment, testing, & commissioning of new system for the Walnut Pump Station <br />- Post -commissioning support (Up to 24 hours) <br />- Block of 160 T&M hours to provide support for a series of City -defined "miscellaneous" projects <br />- Extended T&M Support <br />- Travel allowance for one (1) week onsite <br />Specific tasks included in this project would include: <br />A. Project Kickoff <br />B. System design <br />1. System architecture <br />2. VM inventory & infrastructure <br />3. Security implementation <br />4. 10 communications (10 Servers, OPC Servers, etc.) <br />5. 3rd party system interfaces (remote site SCADA systems, etc.) <br />6. User interfaces & graphics <br />7. Design of new base System Platform templates: <br />a. Generator <br />b. Motor/Pump <br />c. Analog <br />d. Valve <br />e. Discrete <br />f. Communications Object with alias table (to existing Modicon M340 PLC) <br />8. Design of new OMI graphics <br />a. Generator <br />b. Motor/Pump <br />c. Analog <br />d. Valve <br />PO Number: <br />Duration: <br />Freight: <br />Terms: <br />Pages: <br />Quote valid until 2120/21 <br />Prepaid and Add <br />Net 30 Days <br />This quotation may contain engineering services that are subject to additional terms and <br />FOB:Healdsburg,CA conditions. <br />1 of 6 Remit to: E&M, Inc. 126 Mill Street, Healdsburg, CA 95448 <br />calif ornia.wonderware.com <br />