My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WONDERWARE CALIFORNIA
Clerk
>
Contracts / Agreements
>
W
>
WONDERWARE CALIFORNIA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 9:22:34 AM
Creation date
2/8/2021 4:28:10 PM
Metadata
Fields
Template:
Contracts
Company Name
WONDERWARE CALIFORNIA
Contract #
A-2021-002
Agency
Public Works
Council Approval Date
1/19/2021
Expiration Date
6/30/2023
Insurance Exp Date
1/1/2024
Destruction Year
2028
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
California e <br />AVEVA Distributor <br />126 Mill Street <br />Healdsburg, CA 95448 <br />(866) WONDER N <br />(866) 966-3376 <br />Ship To: CITY OF SANTAANA <br />220 S. DAISY AVE <br />SANTAANA, CA 92703 <br />Bill To: CITY OF SANTAANA <br />220 S. DAISY AVE <br />SANTAANA, CA 92703 <br />QUOTE 242538.6 CTYSA <br />AVEVA-WW Walnut Site Integration Services <br />01 /27/2021 <br />Attn: Servando Varela <br />CITY OF SANTA ANA <br />direct( ) fax <br />From: Kristen Hall <br />kristen. hall(o)california.wonderware.com <br />direct (707) 473-3105 <br />main (866) 966-3376 <br />fax (707) 473-3190 <br />Direct Opp <br />Revising <br />c. Migration of legacy history blocks from physical server to new virtual server <br />H. Extended T&M Support <br />1. City is requesting a block of 680 hours of additional T&M time to allow the Engineering Team to support them as they <br />make periodic expansions to the new System Platform -based SCADA system. Intent would be for the time to be used at a rate <br />of approximately one (1) week per month over a period of 19 months. Scope of work would include: <br />a. Periodic reviews of City development work <br />b. Technical assistance as requested <br />c. Documentation assistance as requested <br />PROJECT RESPONSIBILITIES: <br />ENGINEERING TEAM <br />1. Project technical leadership and guidance <br />2. Perform project design, development, commissioning and support tasks as outlined above <br />END USER: <br />1. Provide required project infrastructure, including: <br />a. Server and workstation hardware that meets project requirements <br />b. Server & workstation configuration including VM Hosts, virtualized servers, OS, network, virtualization, etc. <br />c. Server & workstation software licensing, including OS (Windows), virtualization, database, and application software <br />d. Wonderware and other application software licensing (e.g. Dream Report, ThinManager, etc.) <br />e. Make infrastructure available for project development and testing <br />2. Provide physical access to relevant systems and equipment as required X <br />3. Provide reliable, robust remote access to relevant systems sufficient to allow remote support <br />4. Provide required user credentials and permissions <br />5. Ensure that appropriate, qualified staff are readily available to assist with all aspects of the project's design, development, <br />testing, and deployment <br />ASSUMPTIONS: <br />The following are assumptions or considerations that apply to this proposal. Deviations from these may result in schedule <br />impact or additional costs to the client. <br />1. All work will be performed remotely. Commissioning support could be provided onsite with additional of associated travel <br />and living expenses <br />2. Template count and 10 based on data provided by the City for the Walnut Pump Station <br />3. Pump station data will be acquired from existing Modicon M340 PLC. <br />4. No modifications to PLC code is included in project scope <br />5. Base template data content and functionality are assumed to be "nearly identical" (95+% identical) allowing the same base <br />object to be utilized "as built" for all facility devices (e.g. single pump template will work for all pups, etc.) <br />6. Physical installation, wiring & networking of project hardware will be performed by others <br />7. New Historian VM Server will be preconfigured with OS, networking, Aveva software and licensing <br />Wonderware solutions are now AVEVA solutions: Learn more about this exciting change here: <br />hftps://sw.aveva.com/wonderware <br />Interested in additional training? Please visit our website and view our events schedule at www.california.wonderware.com. <br />PO Number: <br />Duration: <br />Freight: <br />Terms: <br />Pages: <br />Quote valid until 2/20/21 <br />Prepaid and Add <br />Net 30 Days <br />This quotation may contain engineering services that are subject to additional terms and <br />FOB: Healdsburg, CA conditions. <br />3 of 6 Remit to: E&M, Inc. 126 Mill Street, Healdsburg, CA 95448 <br />california.wonderware.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.