My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C.S. LEGACY CONSTRUCTION, INC. (2)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
C.S. LEGACY CONSTRUCTION, INC. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2025 9:50:34 AM
Creation date
2/10/2021 5:50:33 PM
Metadata
Fields
Template:
Contracts
Company Name
C.S. LEGACY CONSTRUCTION, INC.
Contract #
P 17-9001, 18-6911
Agency
Public Works
Council Approval Date
1/19/2021
Expiration Date
12/4/2023
Notes
20-6958, 21-6451, 19-6940
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ORDER <br />Project Number Project No. 17-9001 South Main Street Corridor Improvements Change Order Number 4 <br />To C.S Legacy Construction Inc <br />— Contractor <br />You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and <br />specifications on this contract. <br />NOTE: THIS CHANGE ORDER IS NOT EFFFCTIVF l INTI nooanvcn rsv -rum 1,1 -- - <br />Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time <br />Change requested by <br />PUBLIC WORKS AGENCY <br />EXTRA WORK AT AGREED PRICE UNIT PRICE <br />1. Due to field conditions for the location of underground potential conflicts, additional pothole <br />locations identified by USA field markings were required. (PCO #04) <br />TOTAL AGREED PRICE = $13,626.31 <br />2. Due to the underground utilities identified with USA field markings, additional pothole was <br />required to identify alternative locations for the designed Filterra Unit. (PCO #37) <br />TOTAL AGREED PRICE = $1,606.45 <br />3. Due to the existing sewer line on Main Street south of Edinger Street having sag in the <br />profile, CCTV review was not adequate to determine lateral location activity requiring <br />additional surface pothole with additional traffic control. (PCO #38) <br />TOTAL AGREED PRICE = $226.16 <br />4. Due to the existing sewer line on Main Street south of Edinger Street having sag in the <br />Profile, CCTV review was not adequate to determine lateral location activity requiring <br />additional surface pothole with additional traffic control. (PCO 39) <br />TOTAL AGREED PRICE = $169.62 <br />5. Due to additional unmarked underground utilities in the footing for Bus Shelter 6091, the <br />shelter required relocation outside of the conflict location. (PCO #40) <br />TOTAL AGREED PRICE = $2,361.69 <br />Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.