Laserfiche WebLink
CITY OF SANTA ANA <br />PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ORDER <br />Project Number Project No. 17-9001 South Main Street Corridor Improvements Change Order Number <br />To C.S. Legacy Construction, Inc. Contractor <br />You are hereby directed to make the herein changes from the plans and specifications or do the following described work not Included in the plans and <br />specifications on this contract. <br />NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br />Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br />Change requested by PUBLIC WORKS AGENCY <br />EXTRA WORK AT AGREED PRICE <br />11. Due to SoCal Gas performing the final paving and striping work on Main Street between <br />McFadden Avenue and Walnut Street, the existing striping and markings need to be removed <br />and replaced with the proposed project improvement striping in order to have striping in the <br />interim. (PCO #156) <br />TOTAL AGREED PRICE = $16,999.92 <br />12. Due to schedule impacts and the increase in material pricing, the City will pay an additional <br />$10 per Ton for hot mix asphalt pavement over the contract unit price for the deep lift areas <br />performed after the acceptance of the Unclassified Excavation and Pavement Agreement <br />Letter signed November 10,2022. (PCO #157) <br />NOT To EXCEED PRICE = $4,787.40 <br />EXTRA CONTRACT TIME <br />"`Additional time extension and other potential costs to be deferred until all work is <br />completed and critical path impacts are known. <br />TOTAL CHANGE ORDER AMOUNT = $145,722.62 <br />Page 3 of 4 <br />