My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C.S. LEGACY CONSTRUCTION, INC. (2)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
C.S. LEGACY CONSTRUCTION, INC. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2025 9:50:34 AM
Creation date
2/10/2021 5:50:33 PM
Metadata
Fields
Template:
Contracts
Company Name
C.S. LEGACY CONSTRUCTION, INC.
Contract #
P 17-9001, 18-6911
Agency
Public Works
Council Approval Date
1/19/2021
Expiration Date
12/4/2023
Notes
20-6958, 21-6451, 19-6940
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ORDER <br />Project Number Project No. 17-9001 South Main Street Corridor Improvements Change Order Number <br />To C.S. Legacy Construction, Inc. Contractor <br />You are hereby directed to make the herein changes from the plans and specifications or do the following described work not Included in the plans and <br />specifications on this contract. <br />NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br />Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br />Change requested by PUBLIC WORKS AGENCY <br />EXTRA WORK AT AGREED PRICE <br />11. Due to SoCal Gas performing the final paving and striping work on Main Street between <br />McFadden Avenue and Walnut Street, the existing striping and markings need to be removed <br />and replaced with the proposed project improvement striping in order to have striping in the <br />interim. (PCO #156) <br />TOTAL AGREED PRICE = $16,999.92 <br />12. Due to schedule impacts and the increase in material pricing, the City will pay an additional <br />$10 per Ton for hot mix asphalt pavement over the contract unit price for the deep lift areas <br />performed after the acceptance of the Unclassified Excavation and Pavement Agreement <br />Letter signed November 10,2022. (PCO #157) <br />NOT To EXCEED PRICE = $4,787.40 <br />EXTRA CONTRACT TIME <br />"`Additional time extension and other potential costs to be deferred until all work is <br />completed and critical path impacts are known. <br />TOTAL CHANGE ORDER AMOUNT = $145,722.62 <br />Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.