CITY OF SANTA ANA <br />PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ORDER <br />Project Number Project No. 17-9001 South Main Street Corridor Improvements Change Order Number 8 <br />To C.S. Legacy Construction, Inc. Contractor <br />You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and <br />specifications on this contract. <br />NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br />Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br />Change requested by <br />EXTRA WORK AT AGREED PRICE <br />PUBLIC WORKS AGENCY <br />Due to the water main line installation, extra work was performed in order to remove or <br />avoid unforeseen underground conflicts. (PCO #143) <br />TOTAL AGREED PRICE = $186,501.07 <br />2. Due to the irrigation plans showing one 1%' sleeve for two %" irrigation lines, a second sleeve <br />was required in order to accommodate each irrigation line. (PCO #155R1) <br />TOTAL AGREED PRICE = $1,923.83 <br />3. Due to unforeseen base and concrete in the median located north of Warner, extra excavation <br />was performed to remove the material in order to install landscaping. (PCO #167) <br />TOTAL AGREED PRICE = $3,294.26 <br />4. Per the City request, additional striping was installed between Warner Avenue and <br />Chestnut Avenue. This included permanent white edge lines at tree well locations, painting <br />and restriping curbs red, and adding additional signage. (PCO #168 and #171) <br />TOTAL AGREED PRICE = $3,833.30 <br />5. Due to field conditions, a fire hydrant on Main Street and Hobart Street had to be relocated <br />because it did not fit at the location called out per plan. Per City Request, bulb -outs on <br />Pomona East were eliminated therefore the 2" copper line was re-routed to the center <br />median. (PCO #172) <br />TOTAL AGREED PRICE = $10,649.60 <br />Page 1 of 3 <br />