My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C.S. LEGACY CONSTRUCTION, INC. (2)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
C.S. LEGACY CONSTRUCTION, INC. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2023 3:36:39 PM
Creation date
2/10/2021 5:50:33 PM
Metadata
Fields
Template:
Contracts
Company Name
C.S. LEGACY CONSTRUCTION, INC.
Contract #
P 17-9001
Agency
Public Works
Council Approval Date
1/19/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAYOR <br />Miguel A. Pulido <br />MAYOR PRO TEM <br />Juan Villegas <br />COUNCILMEMBERS <br />Phil Became <br />Cecilia Iglesias <br />David Pension <br />Vicente Sarmiento <br />Jose Solorio <br />October 22, 2020 <br />ADDENDUM No. THREE <br />CITY OF SANTA ANA <br />Public Works Agency — Design Engineering <br />20 Civic Center Plaza, M-36 • P.O. Box 1988 <br />Santa Ana, California 92702 <br />m—",santa-ana ora <br />ADDENDUM No. THREE <br />PROJECT 17-9001, 18-6911, <br />20-6958, 21-6451 & 19-6940 <br />CITY MANAGER <br />Kristine Ridge <br />CITY ATTORNEY <br />Sonia R. Carvalho <br />CLERK OF THE COUNCIL <br />Daisy Gomez <br />SUBJECT: Project 17-9001, 18-6911, 20-6958, 21-6451, & 19-6940: South Main <br />Corridor Improvements, South Main Rehabilitation, South Main Sewer <br />Improvements <br />The following changes have been made to Specifications for the subject project: <br />Specifications <br />1. Page vii: Replace with the attached page vii. Added additional Appendix. <br />2. Page 12 of "Part 1 of the General Provisions": Replace with attached page 12 of <br />"Part 1 of the General Provisions". Added UPRR Coordination Requirements <br />3. Page P-1 thru P-7 of P-22: Replace with the attached page P-1 thru P-7 of P-22. <br />Bid quantities are updated and added Bid Alternatives3 through 8 to Bid Proposal. <br />4. Section 11.02 Bioretention: Replace with attached Section 11.02 Bioretention. <br />Description has been updated to show soil material requirements. <br />5. Appendix A: Replace with the attached Appendix A <br />a. Bid Item 13 - ARHM overlay - Bid item description was updated to include <br />crack sealing. <br />b. Bid Item 14 - REAS Type II Slurry Seal - Bid item description was updated <br />to include crack sealing <br />c. Bid Item 69 - Bid item description was updated. <br />d. Bid Item 70 - Bid item description was updated. <br />e. Bid Item 95 — Bid item description was updated. <br />f. Alternative Bid Item 1 - Bid item description was updated. <br />SANTA ANA CITY COUNCIL <br />MiNO A,'undo I Juan egas MNMcerde sarmlento David Penal. Jose Solodo Phil Bear,. Cecilia <br />MayorIglesias <br />Mayor Pro Tam, Ward 5 Wad 1 Ward 2 Wad 3 ( Ward 4 Ward 6 <br />w0do0sanW-ana. or0 INlaDaa DftaaDlaana prp VShclltial110iOi5a111dyna 0m dDanalpza(alaanra` 6mrn 9101oftahW-.opb..e... Osanla-ana0r0 CIoiB61.s�5dnld-and plG <br />
The URL can be used to link to this page
Your browser does not support the video tag.