My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C.S. LEGACY CONSTRUCTION, INC. (2)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
C.S. LEGACY CONSTRUCTION, INC. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2023 3:36:39 PM
Creation date
2/10/2021 5:50:33 PM
Metadata
Fields
Template:
Contracts
Company Name
C.S. LEGACY CONSTRUCTION, INC.
Contract #
P 17-9001
Agency
Public Works
Council Approval Date
1/19/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAYOR <br />Miguel A. Pulioo <br />MAYOR PRO TEM <br />Juan Villegas <br />COUNCILMEMBERS <br />Phil Bacerra <br />Cecilia Iglesias <br />David Penaloze <br />Vicente Sarmiento <br />Jose Solono <br />October 29, 2020 <br />ADDENDUM No. FOUR <br />CITY OF SANTA ANA <br />Public Works Agency — Design Engineering <br />20 Civic Center Plaza, M-36 . P.O. Box 1988 <br />Santa Ana, California 92702 <br />www.santa-ana.org <br />ADDENDUM NO.FOUR <br />- vva <br />20-6958, 21-6451 & 19-6940 <br />CITY MANAGER <br />Kristine Ridge <br />CITY ATTORNEY <br />Sonia R. Carvalho <br />CLERK OF THE COUNCIL <br />Daisy Gomez <br />SUBJECT: Project 17-9001, 18-6911, 20-6958, 21-6451, & 19-6940: South Main <br />Corridor Improvements, South Main Rehabilitation, South Main Sewer <br />Improvements <br />The following changes have been made to Specifications for the subject project: <br />SSRft fications <br />1. Page P-3 of P-22: Replace with the attached page P-3 of P-22. Delete Bid Item <br />Number 51. <br />2. Page 82: Replace with the attached page 82. Revised Section B. Main Line Pipe <br />and Fittings. <br />3. Page 89: Replace with the attached page 89. Revised Section K. Piping Under <br />Pedestrian And Vehicular Pavement. <br />4, ADD Appendix L — Decorative Lighting including Decorative Poles <br />Plans <br />1. Replace complete Construction plan set attached. Below are items that changed <br />on the Constructions plans: <br />a. Replace Sheet 1-01 with the attached Sheet 1-01. Updated Irrigation <br />Legend, <br />SANTA ANA CITY COUNCIL <br />Miguel A. PUele I <br />Mayor i <br />Juan Uillegas <br />Ma or Pro rem, Ware, <br />y <br />! Ycen(e Sarmlenb <br />i ! <br />WaN 1 <br />DaNtl Penabza ! <br />Jase Solono ! Phil Be. ! <br />IDoultlor@sanla-an <br />Mlleeas� 1 <br />to I erg <br />were 2 <br />tl ® I I <br />al. <br />3 i Wshe I <br />Ceciria Iglesias <br />Wand <br />ana.oro <br />Is,brlormaanle-ana i ob.. (W&sanla- I <br />i <br />�leslas(ID I <br />
The URL can be used to link to this page
Your browser does not support the video tag.