My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALL AMERICAN ASPHALT (27)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
ALL AMERICAN ASPHALT (27)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2022 10:57:20 AM
Creation date
2/22/2021 9:08:46 AM
Metadata
Fields
Template:
Contracts
Company Name
ALL AMERICAN ASPHALT
Contract #
P 18-6908
Agency
Public Works
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Page 2 <br />Bristol Street Protected Bike Lanes from Edinger to 1st Street (18-6908), bidding on November 5, 2020 2:00 PM (Pacific) Eii-"i BST Ei <br />Bid Results <br />Type <br />Item Code UOM <br />City <br />Unit Price <br />Line Total Comment <br />4 <br />PCC Curb and Gutter (Type A-2-8) Modified - 1' Gutter <br />LF <br />9022 <br />$22.00 <br />$198,484.00 <br />5 <br />PCC Curb Ramp <br />SF <br />1200 <br />$11.00 <br />$13,200.00 <br />6 <br />PCC Bus Pad <br />SF <br />4900 <br />$15,69 <br />$76,881.00 <br />7 <br />Cold Mill (6") <br />SF <br />43280 <br />$0,60 <br />$25,968.00 <br />8 <br />Cold Mill (8") <br />SF <br />9200 <br />$0.85 <br />$7,820.00 <br />9 <br />PCC Protected Bike Lane (6") - Detail A with dowels <br />LF <br />8350 <br />$40.50 <br />$338.175,00 <br />10 <br />PCC Protected Bike Lane (6") - Detail B <br />LF <br />680 <br />$90.00 <br />$61,200.00 <br />11 <br />PCC Bike Lane at Driveways (8") with Dowels <br />SF <br />11500 <br />$9.63 <br />$110,745.00 <br />12 <br />Colored PCC median with Topcast #5 Exposed Aggregate Finish <br />SF <br />6800 <br />$14.00 <br />$95,200.00 <br />13 <br />Furnish and Install New Water Valve Frame and Cover <br />EA <br />19 <br />$1,000.00 <br />$19,000.00 <br />14 <br />Landscaping - <br />LS <br />1 <br />$62,600.00 <br />$62,600.00 <br />15 <br />Irrigation <br />LS <br />1 <br />$142,500.00 <br />$142,500.00 <br />16 <br />1-Year Landscaping & Irrigafon Maintenance Period <br />LS <br />1 <br />$12,500.00 <br />$12,500.00 <br />17 <br />Construction Sign <br />EA <br />4 <br />$2,000.00 <br />$8,000.00 <br />18 <br />Traffic Signal Modlfcation per Intersection <br />EA <br />4 <br />$33,600.00 <br />$134,400.00 <br />19 <br />2" PVC Conduit <br />LF <br />200 <br />$52.18 <br />$10,436.00 <br />PlanetBids, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.