My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MARK THOMAS & COMPANY, INC.
Clerk
>
Contracts / Agreements
>
M
>
MARK THOMAS & COMPANY, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2021 11:19:09 AM
Creation date
2/22/2021 11:15:13 AM
Metadata
Fields
Template:
Contracts
Company Name
MARK THOMAS & COMPANY, INC.
Contract #
A-2021-018
Agency
Public Works
Council Approval Date
2/2/2021
Expiration Date
2/1/2024
Insurance Exp Date
1/1/1900
Destruction Year
2029
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Each milestone submittal shall include the electronic files of the following <br />documents: Plans, Standard Special Provisions (SSP), preliminary quantities <br />and estimates, pay item list, design calculations and all reports supporting the <br />design (i.e. geotechnical report, hydraulic report). <br />2) The City reviews and comments on the PS&E package within four (4) weeks <br />of receipt of the complete milestone PS&E package. <br />3) Constructability review meeting shall take place at 60% or 90% and shall <br />include Consultant and City engineering staff. <br />c) Final PS&E for Approval and Bidding <br />The Consultant shall submit one set of PDF of the following documents for <br />construction Bid purpose: <br />Signed final design plans <br />Signed final specifications <br />Final cost estimate and final quantity calculations <br />Final design calculations <br />3. Construction Bidding Phase: <br />Bidding procedures will be the responsibility of the City. While the PS&E construction <br />package is advertising for bids, all questions concerning the intent shall be referred to the <br />City for resolution. In the event that any item requiring interpretation in the drawings or <br />specifications is discovered during the bidding period, said items shall be analyzed by the <br />Consultant for decision by the City. <br />4. Construction Support Phase: <br />a) This task shall be included as optional in the fee proposal. <br />b) Consultant shall furnish, at the consultant's sole cost and expense, all necessary <br />revised documents and drawings due to errors and omissions of the Consultant. <br />c) Consultant shall review and approve all submittals and shop plan drawings required <br />to support the construction contract. Consultant shall complete shop drawings <br />reviews within two (2) weeks of receipt. Contract Change Order reviews shall be <br />completed within two (2) working days of receipt. <br />d) Consultant shall be available as requested by the City to resolve discrepancies in the <br />contract documents. Consultant shall bring to the attention of the City any defects <br />or deficiencies in the work by the construction contractor which the Consultant may <br />observe. Consultant shall have no authority to issue instruction on behalf of the <br />City, or to deputize another to do so. <br />e) The Consultant shall prepare and deliver to the City the final as -built plans <br />incorporating field marked prints supplied by the City. Upon completion of <br />construction, the City will submit field -marked prints to Consultant. Consultant <br />City of Santa Ana RFP 20-113 <br />Page Al-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.