Laserfiche WebLink
CITY OF SANTA ANA <br />RFP NO.: 20-089 <br />WASTE DISCHARGE REQUIREMENTS COMPLIANCE SERVICES <br />Waste Discharge Requirements (WDR) and Sewer System Management Plans (SSMP). <br />The consultant shall be knowledgeable with the State's environmental compliance <br />regulations including the Sanitary Sewer System Waste Discharge Requirements <br />issued by the Water Resources Control Board. The consultant shall provide <br />environmental compliance services including: <br />• Performing the City's SSMP Audits as required by the WDR regulations, <br />assessing the effectiveness and performance of key WDR programs, and <br />preparing a report of the findings and recommendations. <br />• Preparing City's 2024 SSMP update as required by the WDR regulations utilizing <br />the 2019 SSMP update and 2017 SSMP audits as foundations. <br />• Providing quarterly WDR training and advising City staff on emerging issues, <br />revisions and additions to the SSS WDR. <br />• Provide updates and training on SSO contingency plans for the City's sewage lift <br />stations. <br />• Providing SSO response support, including data analysis, volume estimating, <br />reporting, etc. <br />• Develop a sewer system maintenance (cleaning) program and schedule which <br />prioritizes sewer main cleaning based on parameters such as topography, <br />condition of pipe, flow characteristics and historical inspection analyses. The <br />proposed sewer maintenance program will optimize cleaning frequencies and <br />resource deployment. Deliverables will include cleaning program maps in PDF <br />format and in GIS format compatible for use with the City's infraMAP software. <br />2. FOG Program Management. <br />The Consultant shall collect, organize, and manage the FOG control program data. The <br />current and existing database shall be maintained and updated. The Consultant shall <br />provide monthly inspection reports and include the following: number of inspections made <br />during the period, findings (i.e. out of compliance, follow-up inspections, etc.), provide <br />recommendations and assist the FOG Manager with follow up documentation and <br />technical expertise. The Consultant shall coordinate meetings with the FOG Control <br />Program Manager to evaluate and prioritize required activities. The Consultant shall be <br />available during normal working hours, after hours and weekends to provide assistance <br />as required. <br />The consultant must be able to maintain the FSE inventory and maintain a schedule that <br />prioritizes FSE inspection frequencies based on FOG production, compliance history, <br />elevated maintenance location relationships, and SSO history. <br />Page 2 of 10 <br />