My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EEC ENVIRONMENTAL (3)
Clerk
>
Contracts / Agreements
>
E
>
EEC ENVIRONMENTAL (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 9:24:02 AM
Creation date
3/1/2021 11:00:14 AM
Metadata
Fields
Template:
Contracts
Company Name
EEC ENVIRONMENTAL
Contract #
A-2021-009
Agency
Public Works
Council Approval Date
1/19/2021
Expiration Date
1/18/2021
Insurance Exp Date
5/24/2025
Destruction Year
2029
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Port Hueneme, CA, US Navy. Directed a one year pilot evaluation of the standard military reverse osmosis water <br />production unit for the U.S. Navy. The seawater RO pilot study evaluated various pretreatment systems including several <br />MF and OF filters and two energy recovery systems. <br />• Pebble Beach Company, Carmel Wastewater Wastewater Recycling System. Responsible for evaluation of reverse osmosis <br />treatment of reclaimed water at Carmel, California. Developed water quality model to optimize tertiary and desalination <br />system design and minimize overall costs to achieve the water quality required for the salt sensitive golf course turf. <br />• Shayba, Saudi Arabia. Technical director and process specialist for a 250,000 gpd reverse osmosis water treatment <br />system. Also served as Project Manager for preparation of environmental impact report on the development of a half - <br />million gallon per day oil field gas separation plant, power generation system, airport serving, jet aircraft, 400 miles of <br />pipeline and 200 miles of new roads. <br />• IBM Electronics Manufacturing, Tucson. Evaluated existing problematic RO system. Piloted, designed and specified a <br />zero -discharge industrial wastewater treatment system incorporating a vapor compression brine concentrator (500 M'/d). <br />The brine concentrator reduced the RO reject flow discharged into over loaded solar evaporation ponds. <br />• Bureau of Reclamation. Served as project consultant for the Bureau of Reclamation's Yuma Desalting Test Facility <br />providing testing, design, and operational evaluations and recommendations. In this role, he evaluated many of the <br />salinity and water quality problems of the Colorado River Basin including management of brines, disposal of softening <br />sludge, and disposal of desalination waste solutions including membrane preservatives and spent cleaning solutions. <br />• Alinda Capital: Technical Consultant for Alinda's Santa Paula CA Water Reclamation Facility. Alinda provided a 4.3 MGD <br />wastewater recycling and groundwater recharge facility using a Design, Build, Own, Operate and Finance Contract (DBOF) <br />vehicle. The facility included a RO system to prevent scaling of the MBR membranes. Dr. Kasper's role included review of: <br />process designs, major equipment specifications and warranties, overall system integration, compliance with DBOF <br />contract terms and conditions, construction contractor progress, and regulatory compliance. <br />• San Francisco Public Utilities Commission, San Francisco CA. Project Manager for Recycled Water Membrane Pilot Studies. <br />Responsible for the procurement and operation of two membrane pilot plants at the Oceanside Water Pollution Control <br />Plant. The pilot plants (GE Zenon and Pall) were used to optimize operating parameters and to develop capital and 0&M <br />cost estimates for producing Title 22 water from 30-30 secondary effluent currently discharged via ocean outfall. <br />• Glenwood Springs Salt Control, CO. Process Specialist for a study evaluating environmental impacts of treatment of saline <br />discharges from Glenwood Springs into the Upper Colorado River. The overall system consists of interception wells, <br />transmission mains, desalination treatment and brine crystallization and drying. <br />• West Basin Municipal Water District, Carson Reclamation Plant, CA. Technical Director for the design and construction of <br />a membrane reclamation plant with ultimate capacity of 20 mgd. The first phase facility consists of 6.5 mgd microfiltration <br />pretreatment, 5 mgd RO, permeate stabilization. Plant feedwater is filtered secondary wastewater effluent and product <br />water has TDS less than 100 mg/L. The microfiltration backwash is nitrified and used for industrial cooling water. <br />• British Petroleum -West Basin Municipal Water District, CA. Determined feasibility and costs for a Reclaimed industrial <br />water supply for the expansion of BP's southern California refinery and for supplying cooling water to a proposed <br />hydrogen fueled power plant. Responsible for evaluating various alternatives for supplying 25 mgd recycled water to the <br />BP Hydrogen Power Plant and Refinery from West Basin's recycled water system. Key considerations included boiler feed <br />water and cooling tower water quality requirements, ammonia levels, and overall TDS and calcium hardness. <br />West Basin Municipal Water District, Carson CA. Responsible for treatment process selection for the expansion of the <br />Carson Regional Water Recycling Facility from 5.8 MGD to 16 MGD. Processes are designed to provide both industrial <br />cooling waters and boiler feed water. The boiler feed water system consists of two pass RO systems followed by a <br />membrane deoxygenation to reduce oxygen to less than 7 ppb. <br />• Los Banos Desalination Test Facility. Managed design project for California Department of Water Resources to evaluate <br />pretreatment and membrane systems for proposed 400-mgd agricultural wastewater desalting plants. <br />Selected Water Quality and Water Treatment Systems <br />• Dubai. UAE Responsible for water quality considerations in the Dubai Water Supply Master Plan and evaluation of <br />corrosion control to mitigate problems resulting from blending multiple water sources in their distribution systems. <br />
The URL can be used to link to this page
Your browser does not support the video tag.