My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RESO 2021-01_3701 S HARBOR BLVD, UNIT E
Clerk
>
Resolutions
>
PLANNING COMMISION
>
2021
>
RESO 2021-01_3701 S HARBOR BLVD, UNIT E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2021 2:22:43 PM
Creation date
3/2/2021 2:22:38 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
View images
View plain text
jmf 1/26/21 <br />Resolution No. 2021-01 <br />Page 6 of 7 <br />EXHIBIT A <br />Conditions of Approval for Conditional Use Permit No. 2020-23 <br />Conditional Use Permit No. 2020-23 for on-premises consumption of alcoholic <br />beverages is approved subject to compliance, to the reasonable satisfaction of the <br />Planning Manager, with all applicable sections of the Santa Ana Municipal Code, the <br />California Building Standards Code, and all other applicable regulations: <br />The Applicant must comply with each and every condition listed below prior to exercising <br />the rights conferred by this conditional use permit. <br />The Applicant must remain in compliance with all conditions listed below throughout the <br />life of the conditional use permit. Failure to comply with each and every condition may <br />result in the revocation of the conditional use permit. <br />1.The sale, service, and consumption of alcoholic beverages shall be permitted in <br />accordance with the operational standards for on -sale establishments pursuant <br />to Section 41-196(g) of the SAMC, in accordance with the provisions of an on - <br />premises alcohol license by the California Department of Alcoholic Beverage <br />Control (ABC), and in accordance with the site and floor plans attached to the <br />staff report documenting the approved scope of the project . <br />2.The sale, service, and consumption of alcoholic beverages shall be limited from <br />8:00 a.m. to 12:00 a.m. (midnight) Monday through Sunday, unless modified <br />through a subsequent and separate conditional use permit application for after - <br />hours operations pursuant to SAMC Section 41-196(g)(3). <br />3.Within 90 days of adoption of this resolution, a Property Maintenance Agreement <br />shall be recorded against the property. The agreement will be subject to review <br />and applicability by the Planning and Building Agency, the Community <br />Development Agency, the Public Works Agency, and the City Attorney to ensure <br />that the property and all improvements located thereupon ar e properly <br />maintained, Applicant (and the owner of the property upon which the authorized <br />use and/or authorized improvements are located if different from the Applicant) <br />shall execute a maintenance agreement with the City of Santa Ana which shall <br />be recorded against the property and which shall be in a form reasonably <br />satisfactory to the City Attorney. The maintenance agreement shall contain <br />covenants, conditions and restrictions relating to the following: <br />a)Compliance with operational conditions applicable during any period(s) of <br />construction or major repair (e.g., proper screening and securing of the <br />construction site; implementation of proper erosion control, dust control <br />and noise mitigation measure; adherence to approved project phasing <br />etc.); <br />b)Compliance with ongoing operational conditions, requirements and <br />restrictions, as applicable (including but not limited to hours of operation,
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).