My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
STEPHEN DORECK EQUIPMENT RENTALS, INC. (3)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
STEPHEN DORECK EQUIPMENT RENTALS, INC. (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2022 11:02:45 AM
Creation date
3/12/2021 9:52:32 AM
Metadata
Fields
Template:
Contracts
Company Name
STEPHEN DORECK EQUIPMENT RENTALS, INC.
Contract #
P 21-6457
Agency
Public Works
Council Approval Date
2/11/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 21-6457 <br />VALLEY ADAMS NEIGHBORHOOD WATER MAIN IMPROVEMENTS PHASE 2 <br />TOTAL BASE BID J 6-7p <br />The lowest.responsible bidder shall be selected based on the total base bid. The City reserves the <br />right to award the Base Bid, and any, all, or none ofthe add -alternate bid items (if any). <br />The quantity For this bid item is shown for bid Comparison only. This bid item shall not be <br />subject to the "25%" limit as stated in Section 3-2 of the Standard Specifications. The aetual <br />amount for this item will be dlctatedhy the actual quantlty used, and the Agency reserves the <br />right to increase or decrease the quantity of this item accordingly; <br />t This bid item is considered a Specialty Item per Section 2-3.2 of the Standard Specifications. <br />TIME FOR COMPLETION OF IMPRQV MENT'S AND LIQUIDATED DAMAGES <br />The undersigned bidder hereby proposes to complete the Work for the total base bid amount <br />shown above, within number fifty-five (55) wnrlcing days after the commencement date stated in <br />the Notice to Proceed. <br />The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the <br />Standard Specifications, shall be $1,300 per calendar day. <br />and names of President, Secretary, Treasurer and Manager, thereof.) <br />P-3 ofP-18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.