My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ATLAS TECHNICAL CONSULTANTS, LLC
Clerk
>
Contracts / Agreements
>
A
>
ATLAS TECHNICAL CONSULTANTS, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2021 12:59:32 PM
Creation date
3/25/2021 12:58:29 PM
Metadata
Fields
Template:
Contracts
Company Name
ATLAS TECHNICAL CONSULTANTS, LLC
Contract #
N-2021-053
Agency
Public Works
Expiration Date
5/3/2021
Insurance Exp Date
1/1/1900
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. A copy of each person's certificate must be on file in the office of the Principal Civil Engineer. <br />The certificate shall list the type of work which the individual is authorized to perform. <br />3. The testing laboratory must be under the supervision of a registered engineer with experience in <br />inspection and testing of construction materials. This engineer shall certify the results of all tests <br />performed by the lab personnel under his/her supervision. <br />4. The selected firm must maintain the laboratory testing equipment in accordance with recognized <br />national standards. <br />5. The selected firm must have an independent assurance testing and sampling program. This <br />program can be performed either by their own personnel not involved in the acceptance testing <br />and sampling, or by another quality assurance organization. <br />6. Correlation Testing Program: The Materials Laboratory shall be a participant in one or more of <br />the following testing programs: <br />a. AASHTO Materials Reference Laboratory (ARML) <br />b. Cement and Concrete Reference Laboratory (CCRL) <br />c. Caltrans' Reference Samples Program (RSP) <br />Aeggoance of Testing and Sampling <br />The selected testing laboratory shall conduct acceptance testing of materials on the first day when <br />work is performed, and continues daily until the work is completed. <br />Reporting Test Results <br />1. When aggregate samples are taken at the material source results of sand equivalent, cleanness <br />value, and sieve analysis shall be submitted to the Resident Engineer within 24 hours. <br />2. When soils and aggregate samples are taken at the job site, results of these tests shall be <br />submitted to the Resident Engineer within 24 hours. <br />3. Results of compaction and density tests taken at the job site shall be submitted to the Resident <br />Engineer within 24 hours. <br />4. When asphalt concrete samples are taken at the plant results of the gradation, oil content, and S- <br />value shall be submitted to the Resident Engineer within 96 hours. <br />5. When asphalt concrete compaction tests are done at the site the results shall be made <br />immediately available to the Resident Engineer. <br />6. All other tests required by the project shall be submitted to the Resident Engineer within 24 <br />hours. <br />Independent Assurance Sampling and Testing <br />The selected firm shall establish and maintain an Independent Sampling and Testing (ISAT) <br />program: <br />1. To verify that the project's sampling and testing is performed correctly by the testers and <br />samplers. <br />2. To ensure the equipment is properly calibrated. <br />3. To provide the Resident Engineer with a copy of the program to ensure that the program is <br />carried out. <br />4. To provide the Resident Engineer with a report indicating actions to be taken by the selected <br />testing firm when discrepancies are found between ISAT and acceptance tests (AT). <br />
The URL can be used to link to this page
Your browser does not support the video tag.