Laserfiche WebLink
COOPERATIVE AGREEMENT C-6-1427 <br />Exhibit C <br />ARTERIAL PAVEMENT MANAGEMENT PROGRAM <br />FINAL PROJECT REPORT FORM <br />Date <br />OCTA <br />Instructions <br />The responsible agency should fill out the following: 1) Final Project Form, 2) Final Cost, 3) Certificate of <br />Completion. Page 4, the OCTA Staff Verification will be filled out by OCTA staff. In addition, the agency must <br />attach before (if available) and after photographs of the project site and the address or location of the site under <br />the Location and Scope of work section. <br />Location and Scope of Work <br />Verification of Match <br />(Actual Expenditures) <br />Match <br />0% <br />Project Schedule <br />Phase <br />Proposed <br />Actual <br />Draft Environmental Document <br />Final Environmental Document <br />Begin Design Engineering <br />Plans, Specifications, and Cost Estimates complete <br />Start Right -of -Way Acquisition <br />Right -of -Way Certification <br />Ready to Advertise <br />Award Construction <br />Project Completion (open for use) <br />