My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TAIT & ASSOCIATES. INC.
Clerk
>
Contracts / Agreements
>
T
>
TAIT & ASSOCIATES. INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 9:47:09 AM
Creation date
4/7/2021 3:34:28 PM
Metadata
Fields
Template:
Contracts
Company Name
TAIT & ASSOCIATES. INC.
Contract #
A-2021-035-08
Agency
Public Works
Council Approval Date
3/16/2021
Expiration Date
4/21/2023
Insurance Exp Date
9/1/2022
Destruction Year
2028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TAIT <br />RILING TO THE CHALLENGE <br />1. Employee Classification <br />06 - Engineering Assistant .......................... _..........._...._....._... <br />16— Project Administrator .___-.......... <br />.___. __. _._.. ............ <br />04 - Engineering Designer I._ ............... .......__._ __.___....._...... <br />10 - Engineering Designer ll.._... .......... ...._.__..,... ............... <br />_._. <br />25- Project Engineer ll......__...... _._....., ___ ._.... <br />03 - Project Engineer/Project Manager ............................... <br />....... <br />02 - Professional Engineer/Licensed Surveyor ................_...... <br />17 - Senior Professional Engineer/Surveyor ....................... <br />....... <br />52 - Principal 11 . _............. ................ ................... <br />01 -Principal ...... ......................... .... ........ .. ................... ..._........ <br />15 - Structural Engineer ............. ....................................... <br />05 - Permit Expediter I ...................... ........................................ <br />.. <br />11 - Permit Expediter II .............. ......................................... <br />09 — Project Coordinator-, ...................................... .............. ... <br />07 - Surveyor ........................ ........... ........ .................... _... ___ <br />08 - Senior Survey Specialist/ Party Chief ...... ....._...... _........ <br />.. <br />00- Two man survey crew' ..................... ................ ._.......... _....... <br />22 - One Man Survey Crew with Robatics.................... <br />90 - Project Manager I ............ ................................ ........ .--- ___ <br />. <br />54 -Entitlement Director.. -.. _. _ .. . .... ...... _... _.................. <br />125 - Assistant Project Manager <br />Schedule of Fees <br />Hourly Rate <br />......... ........ . _.......... ._---. __.. _. _......... _. 70,00 <br />..................... _I ...... .. _....... _............._. 100,00 <br />......................................... _.................. 135..00 <br />._...-..---- ---------- ......................................155.00 <br />........._..___...... ........ __........... _.......... .. 180-00 <br />......._......... ... -....... -...------__----..-_.... 200.00 <br />_...-_......,__._..._..._....._._... _..._..240.00 <br />-------- ------- ------ .... ...._....... ------ ___ 210.00 <br />91 -Project Manager II_ _.. _......... _... _ .............................. ................ <br />16 - Job Captain ..................... <br />70 - Drafter.................__............_.-_-............_...._.__.__----_. <br />._..... _. 90.00 <br />...........105,00 <br />____ 115.00 <br />.......... 105.00 <br />I ... I ... ... 145.00 <br />........... 325.00 <br />........... 225.00 <br />..._._... 145-00 <br />........ 175-00 <br />.........130-00 <br />... 165.00 <br />...' 30.00 <br />. .....85'00 <br />`Prevailing Wage Rates based on current State of California Prevailing Wage Rate Schedule and the assigned <br />project office location <br />The hourly rate for client authorized overtime and for representation at hearings and meetings after 6:DD p.m. will <br />be invoiced at 1.5 times the posted rate. <br />The above rates are inclusive of phone charges, fax charges, software and licensing fees, and photocopying <br />charges. <br />2. Mileage, Travel and Per Diem <br />Auto Mileage: IRS Rate plus 15 percent <br />Air Travel and Auto Rental: Actual cost plus 15 percent <br />Per Diem: Actual cost of lodging and meals, plus 15 percent <br />3. Materials and Supplies <br />Office and CADD supplies are included in the hourly rates. Prints, plots and reproductions are charged at cost <br />plus 15 percent from commercial blueprint companies. In-house reproduction charges are as follows: <br />Prints Plots Color Plots <br />Bond $ .951s.f. $.95/s.f. $6.00/s.f. <br />Vellum 1.351s.f. 1.65/s.f. 7.50/s-f. <br />4, Reimbursable Expenses <br />Will be billed at cost plus 15 percent. Client will pay directly for all ,permit and agency fees, otherwise cost plus <br />15%. Subconsultant invoices will be billed at cost plus 15%. <br />5. Insurance Coverage <br />General Liability: $5,000,000 <br />Errors/Omissions: $1,000,000 <br />California Workers' Compensation - Statutory <br />Certificates of insurance coverage will be provided upon request. <br />Fee Schedule:2019SC-Prevalling1Wages <br />
The URL can be used to link to this page
Your browser does not support the video tag.