Laserfiche WebLink
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: 21-W6 <br />BAKER-GLENWOOD SEWER MAIN UPGRADE <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />14 <br />Asphalt Rubber Hot Mix (ARHM) <br />610 <br />TN <br />$ /a S <br />$ 7/ ��o <br />t� i <br />15 <br />Asphalt <br />(ARAM) <br />5,380 <br />SY <br />$ <br />13 Ofl <br />$ <br />l (1 �Q/ oU-o <br />16 <br />Cold Milling (T=3') <br />48,420 <br />SF <br />$ (91 yo <br />$1 q, 348 <br />17 <br />Unclassified Excavation <br />7 <br />CY <br />$ 4 <br />0 E) <br />$ ql .? O D <br />*18 <br />PCCCross-Gutter (Residential <br />S <br />240 <br />SF <br />S/s a <br />$ <br />3� 6 <br />* 19 <br />Construct 6" Thick PCC Driveway <br />Approach per City Std. Plan 1112 <br />CASO 2 <br />60 <br />SF <br />$ <br />yQ. 010 <br />$ <br />*20 <br />Adjust Water Valve Frame and Cover <br />I I <br />EA <br />$,750 <br />$Q a 6'0 <br />i <br />*21 <br />Additional Potholing (As -Needed) <br />10 <br />EA <br />$y0p <br />$q, p c 10 <br />22 <br />Signing and Striping <br />I <br />LS <br />, S� <br />,7 a <br />�, 7 SO <br />23 <br />Traffic Control <br />I <br />LS <br />$ SO o v <br />i <br />$ � - O D O <br />24 <br />As -Built <br />1 <br />LS <br />$ 25,000 <br />$25,000 <br />2 <br />