My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WRIGHT CONSTRUCTION ENGINEERING CORP. (2)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
WRIGHT CONSTRUCTION ENGINEERING CORP. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2022 11:04:23 AM
Creation date
4/28/2021 3:59:13 PM
Metadata
Fields
Template:
Contracts
Company Name
WRIGHT CONSTRUCTION ENGINEERING CORP.
Contract #
P 17-6802
Agency
Public Works
Council Approval Date
4/6/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ORDER <br />Project Number Project No. 17-6802 Lincoln Avenue Pedestrian Pathway Change Order Number <br />To Wright Construction Engineering Corporation Contractor <br />You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and <br />specifications on this contract. <br />NOTE, THIS CHANGE ORDER IS NOT EFFECTIVE UNTILAPPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br />Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br />Change requested by PUBLIC WORKS AGENCY <br />EXTRA WORK AT AGREED PRICE <br />1. Relocation of Large Boulders on North End of Project (PCO #1) <br />TOTAL AGREED PRICE = $2,500.00 <br />2. Removal of Striping, Installation of Temporary Striping & then Removal of Temporary Striping & <br />Installation of Permanent Striping. (PCO #2) <br />TOTAL AGREED PRICE = $9,062.41 <br />3. On November 23, 2021 the City had requested a Design Change to Add Alternative Items #1 & <br />#2 (See Attached Design Changes). Attached are the costs for the fabrication and installation of <br />the design changes specified by the City. (PCO #3) <br />TOTAL AGREED PRICE = $26,581.50 <br />4. Bid Item #34 Entry Sign Design Change — Original Entry Sign Cost w/ markup: $18,700. <br />New Entry Sign Cost w/ markup: $32,120. Cost increase: $13,420. (PCO #5) <br />TOTAL AGREED PRICE = $13,420.00 <br />5. Bid Item #36 Park Sign Design Change — Original Park Sign Cost w/ markup: $6,050 New Park <br />Sign Cost w/ markup: $10,725. Cost Increase: $4,675. (PCO #5) <br />TOTAL AGREED PRICE = $4,675.00 <br />TOTAL COST = $56,238.91 <br />
The URL can be used to link to this page
Your browser does not support the video tag.