CITY OF SANTA ANA <br />PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ORDER <br />Project Number Project No. 17-6802 Lincoln Avenue Pedestrian Pathway Change Order Number <br />To Wright Construction Engineering Corporation Contractor <br />You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and <br />specifications on this contract. <br />NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br />Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br />Change requested by PUBLIC WORKS AGENCY <br />EXTRA WORK AT AGREED PRICE <br />1. Installation of Red Curb Painting and New Roadway Signs. (PCO #2.2) <br />TOTAL AGREED PRICE = $3,144.45 <br />2. Pilasters on both sides of south end entry per designs from the city. (PCO #6) <br />TOTAL AGREED PRICE=$22,372.50 <br />3. Manhole required lowering to new grade and existing manhole did not have concrete rings in <br />order to lower manhole. In order to lower manhole the 36" concentric riser needed to be <br />removed and a new 24" concentric riser needed to be installed in order to adjust manhole to <br />new grade. All work was completed on force account. (PCO #10) <br />TOTAL AGREED PRICE = $3,552.48 <br />4. Relocation of Water Meter that was in conflict of Wrought Iron Fence Line —All work <br />completed on force account. (PCO #11) <br />TOTAL AGREED PRICE = $5,516.07 <br />5. Repair of damaged curb & gutter from auto accident on 11/27/21 on the Northeast corner of <br />Park Lane & Lincoln Avenue. All work was completed on force account. (PCO #12) <br />TOTAL AGREED PRICE = $6,628.40 <br />6. Installation of additional irrigation for plant materials on the east end of the project. <br />(PCO#13) <br />TOTAL AGREED PRICE = $2,167.45 <br />Page 1 of 2 <br />