Laserfiche WebLink
CONSULTANT SERVICES: <br />Consultant shall be responsible for the preparation and submittal of the PS&E package through <br />completion with the approval from City to release for construction. This shall include, but not limited <br />to, survey, civil engineering, geotechnical investigation and report (for soils analysis), electrical <br />engineering. Any additional tasks deemed necessary by the Consultant shall be clearly identified in <br />the proposal. <br />A. PROJECT COORDINATION. The Consultant shall be fully responsible for the overall <br />management and coordination for the project, which may include, but is not limited to project <br />development team meetings, liaison with affected agencies, and utility companies. Prepare <br />progress report and schedule, securing permits for all field studies and any other required <br />permits from other agencies. <br />B. UTILITY COORDINATION. The Consultant shall be responsible for any necessary utility <br />coordination efforts, including but not limited to coordination with Edison for any electrical <br />service connections necessary for the project. <br />C. RECORDS RESEARCH. Research all information pertinent to the project including, but not <br />limited to existing field condition, as -built plans and record drawings, right-of-way data and <br />all future improvement plans adjacent to or affecting the project site. The selected Consultant <br />shall identify all existing and proposed facilities within the projects limits and potential <br />conflicts. <br />D. SURVEY. Consultant shall identify in the proposal if the survey would include and the detail <br />of the features to be surveyed. All survey and base mapping of the project site shall be prepared <br />in US Customary English units by a California licensed Land Surveyor in accordance with the <br />City guidelines and in Microstation V8i Computer Aided design and Drafting (CADD) format. <br />The horizontal datum shall be NAD 83 and the vertical datum shall be NAVD 88. <br />E. PERMIT. The Consultant shall be responsible for identifying and applying for any necessary <br />permits. All permit requirements shall be added to the bid package for the project. <br />F. PLANS, SPECIFICATIONS, AND ESTIMATES (PS&E) <br />1. Development of Plans, Specifications and Estimate (PS&E): <br />a) All reports, plans, specifications and quantity calculations shall conform to criteria, <br />policies, procedures and standards of the City. The Consultant shall use the <br />boilerplate for cut sheets, specifications and estimates provided by the City. <br />b) The plan development shall include four (4) milestone deliverables-30%, 60%, 95% <br />(pre -final) and 100% (final). All plan sheets shall be prepared at 20 scale unless noted <br />otherwise. The necessary plans for each PS&E package shall include, but not limited <br />to: <br />City of Santa Ana RFP 20-130 <br />Page Al-3 <br />