My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DAVID VOLZ DESIGN LANDSCAPE ARCHITECTS, INC.
Clerk
>
Contracts / Agreements
>
D
>
DAVID VOLZ DESIGN LANDSCAPE ARCHITECTS, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2021 4:13:37 PM
Creation date
5/6/2021 4:12:27 PM
Metadata
Fields
Template:
Contracts
Company Name
DAVID VOLZ DESIGN LANDSCAPE ARCHITECTS, INC.
Contract #
N-2021-095
Agency
Public Works
Expiration Date
4/20/2022
Insurance Exp Date
1/1/1900
Destruction Year
2027
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B <br />FEE SCHEDULE <br />RDWW� lawDuo <br />L '-k- aANhlte-t and mrkviar m <br />David Volz Design proposes the following Not to Exceed fee schedule to provide the services Identified in this <br />proposal. The tasks listed below are offered at a fixed fee for the design services for identified program elements. <br />The services included in this spread sheet are project management, park design, landscape architecture, and <br />listed support services. <br />TASK 1 - PRE DESIGN <br />A. Landscape Architect - Project Management, Pre <br />Design <br />B. Civil Engineering <br />C. Architectural / Structural Engineering <br />D. Electrical Engineering <br />TASK 2 - DESIGN DEVELOPMENT (50% PLANS) <br />A. Landscape Architect - Project Management, <br />Design Development <br />B. Civil Engineering <br />C. Architectural / Structural Engineering <br />D. Electrical Engineering <br />PR <br />LA <br />PP <br />C.T <br />AD <br />Total <br />$220 <br />I $193 <br />I $135 <br />I $121 <br />I $115 I <br />Hrs <br />Fee <br />8 <br />8 <br />8 <br />M122[31] <br />$ 6,166 <br />$ 5,290 <br />$ 2,523 <br />$ '631 <br />$ 14,510 <br />30 40 40 I 40 I 12 II 162 I $ 25,940 <br />TASK 3A-CONSTRUCTION DOCUMENTS (90%PLANS) <br />A. Landscape Architect - Project Management, <br />Construction Documents 32 <br />B. Civil Engineering <br />C. Architectural / Structural Engineering <br />D. Electrical Engineering <br />TASK 3B - FINAL CONSTRUCTION DOCUMENTS <br />A. Landscape Architect - Project Management, Final <br />Construction Documents 2 <br />B. Civil Engineering <br />C, Architectural / Structural Engineering <br />D. Electrical Engineering <br />Proposal to Provide Landscape Architectural Services for <br />Santiago Park Gas House, City of Santa Ana <br />44 1 42 1 44 <br />Mt-W <br />$ 17,825 <br />$ 8,503 <br />$ 2,126 <br />$ 54,393 <br />12 II 174 1 $ 27,906 <br />$ 31,223 <br />$ 14,893 <br />$ 3,723 <br />$ 77,745 <br />2 26 I $ 3,992 <br />$ 10,408 <br />$ 4,964 <br />$ 1,241 <br />$ 20,605 <br />2/21/2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.