Laserfiche WebLink
EXHIBIT A <br />SCOPE OF SERVICES <br />David Volz Design will provide construction documents for public <br />bidding of Santiago Park Gas House Area development plans. <br />The basis of the design will be the city suppiled program and the <br />concept plan to be developed in Task 1 below, <br />Task 1 - Pre -Design <br />Initial project services will include a site analysis, review of the <br />preliminary plan and review of background documents. A kick-off <br />meeting with the city project staff will be held to review initial flnd- <br />Ings, discuss the project scope, goals and objectives, potential <br />elements and issues and schedule. The DVD team will facilitate <br />and lead three (3) concept planning meetings with the Park San- <br />tiago Neighborhood Association (PSNA) to obtain input and to <br />finalize a concept plan for this area. <br />Meetings - Project Kick-off Meeting with city staff <br />Three (3) Concept Planning Meetings with PSNA <br />Presentation and review for approval by the <br />PRCSA <br />Deliverables - Synopsis of Initial reviews and project schedule <br />Up to three (3) rendered concept plans for <br />community review <br />Final Concept Plan for the area development <br />Task 2 - Design Development (60% plans) <br />The park design will be developed based upon the approved con- <br />ceptual design. The DVD team will undertake Initial engineering, <br />landscape architectural, and electrical engineering. <br />Meetings - City Project Team Review Meeting <br />Deliverables - 50% construction documents, draft technical <br />specifications, opinion of probable cost, lighting <br />layouts, photometrics, materials submittal. Also, <br />site survey and utilities information will be <br />submitted for city review. <br />Task 3A - Construction Documents (90% plans) <br />Construction documents will be updated based upon city guid- <br />ance after review of Design Development documents. The up- <br />dated plans will provide detailed engineering, landscape, irriga- <br />tion and construction layout plans. Plans shall include: <br />Tustin Branch Treks, <br />City of Tustin <br />Los Rios Park City at San Juen Capistrano <br />Pioneer Road Park, <br />Cityot Tustin <br />Hudess Barton Amphitheater. City atyarba Linda <br />5.......................................................................................... wIB�R® <br />nesigning ldndscape that create community ... �������������������������������������������������...._ .. <br />