Laserfiche WebLink
`•, p Pacific Electric Bike Trail — Phase 2, Sand pointe Park <br />RR�� RFP No. 20-129 <br />Pacific Electric Bike Trail Phase II <br />Preliminary Engineering <br />72 <br />$9,624 <br />Design Development <br />117 <br />$13,827 <br />Construction Documents <br />128 <br />$15,521 <br />Bid Advertisement, Construction Administration, Record Drawings <br />36 <br />$4,663 <br />Reimbursables <br />$2,400 <br />Totals <br />353 <br />$46,035 <br />Sandpoint Park <br />Preliminary Engineering <br />TotalTask <br />21 <br />$2,666 <br />Design Development <br />51 <br />$5,728 <br />Construction Documents <br />53 <br />$6,321 <br />Bid Advertisement, Construction Administration, Record Drawings <br />16 <br />$1,901 <br />Reimbursables <br />$2,400 <br />Totals <br />141 <br />$19,016 <br />IDS GROUP Page 2 <br />