My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-1-3289)
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-1-3289)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2024 4:43:51 PM
Creation date
5/20/2021 2:35:44 PM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-1-3289)
Contract #
A-2020-211
Agency
Public Works
Council Approval Date
11/17/2020
Notes
TUSTIN CITY OF. FOUNTAIN VALLEY, CITY OF
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />MEMORANDUM OF UNDERSTANDING NO. C-X-XXXX <br />northbound lane configuration when implementing the Flower Street complete street <br />project. The northbound approach lane configuration shall remain as one left turn lane, <br />two thru lanes, and one right turn lane. <br />4. Standard Avenue and 41h Street: This intersection does not currently exist. The CITY <br />of Santa Ana will construct the intersection as identified in Exhibit D. The northbound <br />and southbound lanes shall be constructed as one left turn' I ne, one thru lane, and <br />one right turn lane when the intersection is established The eastbound and <br />westbound lanes shall be constructed as one left turn lane, -,on .thru lane, and one <br />thru-right lane when the intersection is established. <br />_,- <br />5. Grand Avenue and McFadden Aven6 a CIT) o Santa Ana shall not reduce the <br />existing eastbound lane configuration when implementing the McFadden Avenue <br />complete street project. Ttieeastbound approaqlane configuration shall remain as <br />one left lane, one thru lanes, 6nd�one thru'�riW lane." <br />1 <br />6. Tustin Avenue and Santa Clara Avenue: The CITY of Santa Ana shall not reduce the <br />existing eastbound,and westbound lane configuration when constructing the Santa <br />Clara{Avenue complete street roject. The eastbound and westbound lane <br />configuration,sh`all remain as one left turn lane, one thru lane, and one thru-right lane. <br />C. The CITY of S nta na shall transfer a lump sum of $250,000 to AUTHORITY within 30 <br />days of the;ezecution of this MOU to fund a cooperative study led by AUTHORITY. The cooperative study <br />will identify appropriate and 'feasible transit improvements (including but not limited to transit signal priority <br />and/or queue jumping lanes),,to maintain or improve AUTHORITY'S high quality transit service on the 1st <br />Street corridor and McFadden Avenue corridor. The cooperative study shall identify the funding and <br />implementation responsibilities between the CITY of Santa Ana and AUTHORITY. The recommendations <br />from the cooperative study shall be incorporated into the design of the complete street projects along the <br />1 st Street corridor and McFadden Avenue corridor, unless otherwise agreed upon. <br />D. The CITY of Santa Ana and AUTHORITY shall mutually coordinate implementation of <br />feasible transit improvements identified from the cooperative study to maintain or improve AUTHORITY's <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.