Laserfiche WebLink
ATTACHMENT K <br />County Administration South <br />601 North Ross Street <br />Santa Ana, CA 92701 <br />P.O. Box 4048 <br />Santa Ana, CA 22702 <br />(714)667-8800 <br />info@ocpw.ocgoy.com <br />OCPubllcWorks.com <br />Administrative <br />Services <br />OC Development <br />Services <br />OC Facilities Design <br />& Construction <br />Management <br />OC Faallitles <br />Maintenance <br />8, CUF <br />OC Fleet Services <br />dCP"u"b"'11'C'"W"'orks <br />September 3, 2020 <br />Nabil Saba, P.E. <br />Executive Director <br />Public Works Agency <br />City of Santa Ana <br />20 Civic Center Plaza <br />Santa Ana, CA 927or <br />Re: City of Santa Ana Proposed Master Plan of Arterial Highways (MPAH) Reclassifications <br />Dear Mr. Saba, <br />Orange County Public Works has reviewed the July 2020 traffic study prepared by IBI Group <br />analyzing proposed Master Plan of Arterial Highways (MPAH) reclassifications in various <br />locations throughout Santa Ana. <br />Overall, Orange County Public Works is supportive of the proposed amendments. As the studies <br />progress, we are requesting that the following key comments be addressed: <br />6 Broadway between rst and iy+h (Secondary to Divided Collector) <br />Broadway is one of the streets being amended, therefore, the report should include both <br />Roadway Segment and Intersection LOS analysis for current year (2020) conditions as <br />well as a future year (2045) forecast c. <br />1st Street between Bristol St. and Tustin Ave (Major to Primary) <br />Currently the roadway segment between Main Street to Standard Avenue carries an ADT <br />Of 42,699 and the LOS is C as a Major Arterial, which is the acceptable LOS Per Orange <br />OC Construction County Highway Design Manual. Amending the roadway to a Pimary will result in an <br />unacceptable LOS on this segment. <br />OC Environmental Thank you for the opportunity to provide comments on the draft study report. Should you have <br />Resources questions on our comments, please do not hesitate to contact my staff, Wei Zhu, at (714) 647- <br />3976 or wei.zhu@ocpw.ocgov.com <br />OC Operations & Sincerely, <br />Maintenance <br />OC Inirashuature <br />Programs N rdyK ,PE/PMP <br />D uty Director, Infrastructure Programs <br />OC Survey Attachment: 20.07.21 SAGP Traffic Impact Analysis_oepw comments <br />