My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE, COUNTY OF (PUBLIC WORKS MATERIALS LABORATORY)
Clerk
>
Contracts / Agreements
>
O
>
ORANGE, COUNTY OF (PUBLIC WORKS MATERIALS LABORATORY)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2021 10:01:48 AM
Creation date
6/7/2021 10:34:57 AM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE, COUNTY OF (PUBLIC WORKS MATERIALS LABORATORY)
Contract #
A-2021-086
Agency
Public Works
Council Approval Date
6/1/2021
Expiration Date
5/31/2024
Destruction Year
2029
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REPORTING ACCEPTANCE TESTING RESULTS <br />The following are the schedules for reporting material test results to the Resident Engineer: <br />• When the aggregate is sampled at material plants, test results for Sieve Analysis, Sand <br />Equivalent and Cleanness Value should be submitted to the Resident Engineer within two <br />(2) working days' after sampling. <br />• When materials are sampled at the job site, test results for compaction and maximum density <br />should be submitted to the Resident Engineer within one (1) working day after sampling. <br />• When soils and aggregates are sampled at the job site: <br />1. Test results for Sieve Analysis, Sand Equivalent°and Cleanness Value should be <br />submitted to the Resident Engineer within three (3) working days after sampling. <br />2. Test results for "R" Value and asphalt concrete extraction should be submitted to the <br />Resident Engineer within four (4) working days after sampling. <br />When sampling products such as pottland cement concrete (PCC), cement -treated base (CTB), hot <br />mix asphalt (HMA), and other such materials, the time of sampling shall be varied as much as <br />possible in order to avoid a predictable sampling routine. <br />1 For aggregate containing asphalt, test results will be submitted to the Resident Engineer within <br />three (3) working days <br />Page 11 of 25 Quality Assurance Plan 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.