My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Presentation #29
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
06/01/2021 Regular
>
Presentation #29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2021 10:29:10 AM
Creation date
6/10/2021 10:26:49 AM
Metadata
Fields
Template:
City Clerk
Date
6/1/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works Agency <br />Goals • Implement a comprehensive street design program which considers <br />other infrastructure needs such as water, sewer, streetlights, signage and <br />sidewalks during the project design phase. <br />• Require all infrastructure CIP projects to include safety features such as <br />fencing, more durable traffic safety controls for bike lanes, anti -graffiti <br />coatings on street signs, and enhanced, colored hardscape in lieu of <br />asphalt surfaces. <br />• Begin assessment and consolidation of completed infrastructure plans <br />(Water, Sewer, Storm Drain, Street Trees, Traffic Signals, Pavement <br />Management) into a agency -wide comprehensive master plan. <br />• Complete a standardized, scheduled Facility Assessment for all City <br />facilities to develop a 10-year facilities CIP plan. <br />• Improve pothole repair service to 48-hour response time by utilizing and <br />marketing the City's MySantaAna App. <br />• Implement improved technology to manage the water distribution <br />system and enhance customer service. <br />74 <br />
The URL can be used to link to this page
Your browser does not support the video tag.