Laserfiche WebLink
Public Works Agency <br />Goals • Implement a comprehensive street design program which considers <br />other infrastructure needs such as water, sewer, streetlights, signage and <br />sidewalks during the project design phase. <br />• Require all infrastructure CIP projects to include safety features such as <br />fencing, more durable traffic safety controls for bike lanes, anti -graffiti <br />coatings on street signs, and enhanced, colored hardscape in lieu of <br />asphalt surfaces. <br />• Begin assessment and consolidation of completed infrastructure plans <br />(Water, Sewer, Storm Drain, Street Trees, Traffic Signals, Pavement <br />Management) into a agency -wide comprehensive master plan. <br />• Complete a standardized, scheduled Facility Assessment for all City <br />facilities to develop a 10-year facilities CIP plan. <br />• Improve pothole repair service to 48-hour response time by utilizing and <br />marketing the City's MySantaAna App. <br />• Implement improved technology to manage the water distribution <br />system and enhance customer service. <br />74 <br />