My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DOKKEN ENGINEERING
Clerk
>
Contracts / Agreements
>
D
>
DOKKEN ENGINEERING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2021 10:46:21 AM
Creation date
6/14/2021 10:23:02 AM
Metadata
Fields
Template:
Contracts
Company Name
DOKKEN ENGINEERING
Contract #
A-2021-084
Agency
Public Works
Council Approval Date
6/1/2021
Expiration Date
5/30/2024
Insurance Exp Date
1/1/1900
Destruction Year
2029
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
€j+ MCFADDEN AVENUE PROTECTED BIKE LANE AND sq <br />BICYCLE BOULEVARD PROJECT <br />CITY OF SANTA ANA <br />Task 2 — Preliminary Research & Investigation <br />Task 2.1 — Topographic Surveys (Optional Task): Dokken with Guide Surveying, Inc. will provide <br />topographic surveys of The McFadden Bike Project as follows. <br />Aerial Topographic Survey Aerial photogrammetric survey methods will be utilized to capture digital <br />color imagery along McFadden Avenue from Fairview Avenue to Main Street. Horizontal and vertical <br />aerial control panels will be set to meet aerial triangulation requirements and tied into the survey <br />controls established for the project. A digital topographic map at a scale of 1" = 40' with a 1-foot contour <br />interval will be compiled over the project limits. Color digital orthophotography at a scale of 1" = 50' <br />with a pixel ground resolution of 0.25 foot (200 pixels per inch) will also be provided. <br />Record Land Net (Centerline and Right -of -Way) Surveys: Cadastral research will be performed for <br />the project area with the County of Orange and the City of Santa Ana for existing centerline and right- <br />of-way files and/or available cadastral records in support of the record boundary of the streets affected <br />by the project. Record right-of-way surveys will be performed for the project area and will include <br />research for existing centerline monuments and controls to tie the record boundary to the topographic <br />mapping data. The record map will include record centerlines, rights -of -way of the adjacent streets, <br />and lots/easements taken from the recorded tract and parcel map information, as well as underlying <br />cadastral, title, and ownership information as recorded with the Orange County assessor's offices. <br />Task 2.2 — Supplemental Topographic Surveys: Conventional ground survey methods will be <br />utilized to supplement the aerial mapping and collect detailed topographic data at ADA ramp locations, <br />bulb outs and in areas of proposed hardscape improvements. The topographic data may include curb <br />and gutter, flowlines, walkways, building corners, walls and fences, hardscape features, trees, <br />driveways, surface visible utility features (meters, cabinets, pull boxes, manholes, catch basins, poles, <br />etc.). The topographic data will be downloaded, processed, and tied to the horizontal and vertical <br />control established for this project. The topographic data will be plotted in CAD, incorporated with the <br />aerial mapping and a digital terrain model (DTM) created for the existing ground surface, if applicable. <br />The final deliverables will include the digital terrain model, topographic data plotted in CAD and an <br />ASCII file of the topographic survey points. For the purposes of this proposal, 120 field crew hours <br />and associated office processing and mapping time has been included. This task will be <br />performed at the direction of the design team. <br />Task 2 Deliverables: Topographic Survey Data and Digital Terrain Model for 1-foot Contours and an <br />ASCII File of the Topographic Survey Points; Record Right of Way Mapping; Field Notes <br />Task 3 — Drainage & Water Quality Design <br />Task 3.1 — Draft/Final Drainage Memorandum: A Drainage Memo will be prepared to document <br />any drainage modifications caused by project improvements. This scope assumes hydraulic analysis <br />of the impacted facilities will be limited to inlet and open channel flow analyses in accordance with <br />local methodologies. The analyses will indicate that proposed minor modifications will not result in <br />decreased collection or conveyance capacities. This Memo will provide a brief discussion of the <br />existing conditions, post -project drainage patterns and conditions, results of the on -site hydraulic <br />analyses and any issues of special concern or significance. A draft Memo will be submitted to the City <br />at the 60% PS&E milestone and will be finalized upon completion of the 100% Final PS&E submittal. <br />Task 3.2 — Draft/Final Green Streets Water Quality Management Plan: Dokken will prepare a <br />Water Quality Management Plan (WQMP) in accordance with the Orange County Model Water Quality <br />Management Plan and Technical Guidance Document to comply with the Santa Ana Region Orange <br />County MS4 Permit (Order No. R8-2009-0030 amended by Order No. R8-2010-0062). The WQMP <br />will document the following Green Streets design features: <br />• A description of the project and the major engineering features. <br />• A description of the feasible Site Design Measures and Green Streets BMPs including <br />justification of Measures and BMPs considered infeasible or not applicable to the project. <br />]7®KKEN Page 1 2 <br />GNGINHLRINfI <br />
The URL can be used to link to this page
Your browser does not support the video tag.